标准规范下载简介:
内容预览由机器从pdf转换为word,准确率92%以上,供参考
parker接头样本FluidConnectors
FluidConnectors
DG/TJ08 2034-2008 预拌混凝土和预制混凝土构件生产质量管理规程nedium)forhigherservicetemperatures
ableH1—Pressure Reductions ntermediate values are to be interpolated
AssemblyInformation
Parker Hannifin Corporation Tube Fittings Division Columbi Ohio
Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic
Catalog4300 Technical Datal
Assembly in fitting body (for steel and copper tubes
Catalog4300 Technical Data
Assembly in fitting body
Catalog4300 Technical Data
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Technical Data
Parker Hannifin Corporation Tube Fittings Division Columbi Ohio
Catalog4300 Technical Data
Assemblingwithsupportsleeves(VH)
Fig.H5EOFitting CompletelyAssembled withSupport S
EO Fitting Completely Assembled with Support Sleeve
Catalog4300 Technical Data
Assemblyofsupportsleeves
Catalog4300 Technical Data
Connectors,UnionsandElbows
ubeunlohs G, W, T, K, SV, WSV, ESV, RED, KOR, GR, TR
Assemble tube ends and swivel ends in accordance with the Tube End Assembly Information on pages H8 through H13.
Connectorsand Elbows (DIN3852):
Connectorsand Elbows
BanjosandSwivels
Banjo Assembly:SWVE,WH,TH
ivel Assembly: EW, ET, E
Assembly of the male stud end should be in accordance with the informationabove insectionConnectorsand Elbows(DlN [3.852)
Weld Nipples
Weld Nipple Assembly
Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic
Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic
Catalog4300 Technical Datal
Surface Finish: EO Hydraulic Flange fittil Socket head cap screws Spring washer
ableH4 Number of Revoluations and Starting Torques **A minimum working pressure of 10 bar is necessary!
Flange Assembly: Assemble tube ends in accordance with the Tube End Assembly Information on pages H8 through H13. See Table H3 for torque information for socket head cap screwsforBFGand BFWflange fittings.
Socketscrew Tightening centers Sockethead torques (LK) cap screws Nm* LK35 M6 10 LK40 M6 10 LK55 M8 25
TableH3Tightening Torques forFlangeAssemblies *Based on friction number utotal = 0.14
BallBearingRotaryFittings
FluidConnectors
PlainBearingRotaryFittings
TableH5NumberofRevolutions
Parker Hannifin Corporation Tube Fittings Division Columbi Ohio
Catalog4300 Technical Data
Parker Hannifin Corporation Tube Fittings Division Columbi Ohio
Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic
Catalog4300 Technical Data
EOTroubleShootingGuide
TableH7EOFittingTroubleShootingHints
Parker Hannifin Corporation Tube Fittings Division Columbi Ohio
Catalog4300 Technical Datal
Introduction
Design and Construction
FluidConnectors
Parker Hannifin Corporation Tube Fittings Division Columbi Ohio
Catalog4300 Technical Datal
Part Numbering
TheAdvantages
The Applications
Media Compatibilit
Permissible working media for NBR seal materials (e.g. buna V
Parker Hannifin Corporation Tube Fittings Division Columbi Ohio
Tube Fittings Division Columbus. Qhic
Catalog4300 Technical Data
Parker Hannifin Corporation Tube Fittings Division Columbi .Ohio
Catalog4300 Technical Data
HydraulicPresettingMethods
Parker Hannifin Corporation Tube Fittings Division Columbi Ohio
Catalog4300 Technical Data
Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic
Tube Fittings Division ParkerHannifinCorporation
Catalog4300 Technical Data
Tube Fittings Division ParkerHannifinCorporation Columbus.Qhic
Tube Fittings Division ParkerHannifinCorporation
Catalog4300 Part Datal
Metric Tube End Al3 Ends
All dimensions in millimeters
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Part Datal
Union Cross
Metric Tube End Am 4 Ends
I dimensions in millimeters
Dimensions given approx.figures with tightened nut
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Part Datal
Male Connector
AQ 4238-2014 日用化学产品生产企业防尘防毒技术要求MetricTubeEnd /Male BSPT/BSPP Thread
All dimensions in milimeter
Continuationof LandseriesSseepageH30
Parker Hannifin Corporation Tube Fittings Division Columbu
Catalog4300 Part Datal
Male Connector
DL/T 2006-2019 干式空心电抗器匝间绝过电压试验设备技术规范MetricTubeEnd /Male BSPT/BSPP Thread
All dimensions in milimeter