AISC 360-16 Specification for Structural Steel Buildings.pdf

AISC 360-16 Specification for Structural Steel Buildings.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:7.1 M
标准类别:其他标准
资源ID:243415
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

AISC 360-16 Specification for Structural Steel Buildings.pdf

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLEOFCONTENTS

JB/T 5403-2014 直焊性聚氨酯漆包圆电阻线Specification for Structural Steel Buildings, July 7, 20 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLE OFCONTENTS

Specification for Structural Steel Buildings, July 7, 201 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLEOFCONTENTS

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLE OFCONTENTS

Unframed Ends of Beams and Girders 8. Additional Stiffener Requirements forConcentrated Forces. Additional Doubler Plate Requirements for Concentrated Forces 10. Transverse Forces on Plate Elements .

Specification for Structural Steel Buildings, July 7, 201 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLEOFCONTENTS

Specification for Structural Steel Buildings, July 7, 201 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLE OFCONTENTS

PENDIX3.FATIGUE 3.1. General Provisions 3.2. Calculation of Maximum Stresses and Stress Ranges 3.3. Plain Material and Welded Joints 3.4. BoltsandThreadedParts 3.5. Fabrication andErection Requirements forFatigue 3.6. Nondestructive Examination Requirements for Fatigue

Specification for Structural Steel Buildings, July 7, 201 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLE OFCONTENTS

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLE OF CONTENTS

COMMENTARY ON THE SPECIFICATION FOR STRUCTURA

B. DESIGN REOUIREMENTS

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLEOFCONTENTS

C. DESIGN FOR STABILITY

DESIGN OF MEMBERS FOR FLE

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLE OFCONTENTS

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLEOFCONTENTS

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLE OFCONTENTS

pecification forStructural SteelBuildings,July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLEOFCONTENTS

K. ADDITIONAL REQUIREMENTS FOR HSS AND

L. DESIGN FOR SERVICEABILIT

TABLE OFCONTENTS

M. FABRICATION AND ERECTI

Specification for Structural Steel Buildings, July 7, 201 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLEOFCONTENTS

DIX3.FATIGUE .523 3.1. GeneralProvisions 523 3.2. Calculation of Maximum Stresses and Stress Ranges . .524 3.3.Plain Material and Welded Joints.. .524 3.4. Bolts and Threaded Parts 3.5. Fabrication and Erection Requirements for Fatigue 527

3.1.General Provisions 523 3.2. Calculation of Maximum Stresses and Stress Ranges . .524 3.3.Plain Material and Welded Joints.. .524 3.4.Bolts and Threaded Parts 526 3.5.Fabrication and Erection Requirements for Fatigue 527

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

TABLE OFCONTENTS

Definition

Specification for Structural Steel Buildings, July 7, 201 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ecificationforStructural SteelBuildings,July7,2016

ecificationforStructural SteelBuildings,July7,2016

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

Specification for Structural Steel Buildings, July 7, 201 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

App. 8.2.2

Specification for Structural Steel Buildings, July 7, 201 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

Section H3.1

Specification for Structural Steel Buildings, July 7, 201 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

GB/T 37908-2019 基于光学椭偏成像的无标记蛋白质芯片分析方法通则pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

pecification for Structural Steel Buildings, July7,2016 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

App. 7.3.2

Specification forStructural Steel Buildings, July7,20 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

GJB 2028A-2007 磁粉检测Specification forStructural Steel Buildings, July7,20 AMERICAN INSTITUTE OF STEEL CONSTRUCTION

Delinition Section Minimumreinforcementratioforlongitudinal reinforcing Anglebetweenthelineof actionof therequiredforceandthe weld longitudinal axis,degrees. . .J2.4 Acuteanglebetweenthebranchandchord,degrees . . K3.1 Stiffnessreductionparameter C2.3

Minimumreinforcementratioforlongitudinalreinforcing Anglebetweenthe lineof actionof the requiredforceand the weld longitudinal axis, degrees.. Acuteanglebetweenthebranch and chord,degrees. K Stiffnessreductionparameter

©版权声明
相关文章