建筑设计防火规范(2018年版)英文版.pdf

建筑设计防火规范(2018年版)英文版.pdf
VIP全站资料免积分下载
没有资源,无法下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:77.7 M
标准类别:建筑工业标准
资源ID:275379
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

建筑设计防火规范(2018年版)英文版.pdf

3.3.9Staff dormitorymustbe strictly prohibitedi

Table 3.5.2(continued

Table 3.5.2(continued

Table 3.5.4Fire separation distance between any grain silos and other buildings and between any two grain silo groups(m)

DB21T 1799.3-2010 信息服务管理规范 第3部分:计算机信息系统运营和维护管理The areas for pressure relief shall be away from assembly places or main roads,and should be

Classification of substances with explosion hazard in factory buildings and the minimum pressure relief ratio(m'/m)

2Kar.the dust explosion index

3.6.8ThecentralcontrolroomofClassAandBfactorybuildingswithexplosionhazar

Table 3.7.4Distance from any point to the nearest exit in thefactory buildings(m

3.7.5The total clear width of exit stairway,passageway and door in the factory buildings shall be determined by calculation based on theminimumclearwidth for evacuation per 1oo persons not less than those specified in Table 3.7.5.However,the minimum clear width of exit stairway,passageway and door should not be less than 1.1om, 1.40m and 0.90m, respectively If the occupant loads are not equal on each floor, the total clear width of exit stairway shall be determined by calculation floor by floor.The total clear width of stairways on any floor shall be determined by calculation according to maximumoccupantloads ofthisfloorandthefloors above.

Thetotal clearwidthoftheexteriordooronthefirstfloorshallbe determinedby according to the occupant loads on this floor and the floors above.The minimum clear width o shall be not less than 1.20 m

The total clear width of the exterior door on the first floor shall be determined by calculat ording to the occupant loads on this floor and the floors above. The minimum clear width of the d ll benot less than 1.20 m.

3.8Evacuationofstorages

4Class A,B,Cliquid andgastanks(tankfarm)and

4.1 Generalrequirements

id barrels and otherbuildings shall be not less than those specified in Table 4.2.1. Table 4.2.1Fire separation distance between Class A,B,C liquid tanks(tank farm),stacks of Class B, C liquid barrels and other buildings(m)

1The volume of a single tank and the total volume of the tank group shall be not greater thanthosespecified inTable 4.2.3. Table 4.2.3Maximum volume of Class A,B and C liquid tanks arranged by group(m')

Table4.3.3Fire separatic nk andbuilding/storagetank/s

Table 4.3.3Fire separation distance between the wet oxvgen tank and building/storage tank/stackvard(m)

ireseparationdistanceofLPGtanks(tankfari

Table 4.4.1(continued)

Table4.4.5 cylinde ation(m)

Table 4.5.1(continued

5Civil buildings

Table 5.1.1Classification of civil buildings

Table 5.1.2(continued)

5.2General layout

Table 5.2.2Fire separation distance(m)between civil buildings

5.3.1AThebuildingheightoftheindependentClass andClassagedcarefacilitiesshouldbenot greater than 32m,and shall be not greater than 54m; the independent Class IlI aged care facilities shall benotgreaterthan2storeys

5.5Evacuationandre

5.5Evacuationandrefuge

GB/T 15802-2011 棉花叶螨测报技术规范5.5.1Evacuation and refuge facilities shall be provided for civil buildings based on the

1Evacuation and refuge facilities shall be provided for civil buildings based on the building heig

Table 5.5.8Public buildings where one exit stairway may be provided

Healthcarebuildings,hotels,agedcarefacilitiesorthelike; Buildings with entertainmentand amusementoccupancies; 3Stores,libraries,exhibitionbuildings,conferencecentersorthelike;

4Otherbuildings not less than5storeys

Table 5.5.17Distance from the exit door of a room to the nearest exit(m

DB13T 601-2005 无公害果品 磨盘柿生产技术规程ble5.5.18 irstfle xitpas uildings(m

©版权声明
相关文章