BS5467-1997 额定电压600-1000V热塑性绝缘铠装电缆.pdf

BS5467-1997 额定电压600-1000V热塑性绝缘铠装电缆.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:4.3 M
标准类别:电力标准
资源ID:269688
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

BS5467-1997 额定电压600-1000V热塑性绝缘铠装电缆.pdf

OBSI25February2004

BS 54671997

Numbers oneach core shall beprinted in a colourcontrasting with that of the insulation. The height of the individual number shall be not less than 1.5mm. The spacing shall be such that each number is repeated at intervals not greater than 70 mm Conformityshall becheckedbyvisual examinationandmeasurement

7.3Clarityanddurability The colour or the number used for core identification shall be clearly identifiable and durable such thati annotbe removed when rubbed i0 times with a piece of cotton wool or cloth soaked in water.

GB/T 28423-2012 电子收费 路侧单元与车道控制器接口OBSI25February2004

9.2Thickness of bedding

BS 5467:1997

Theapproximatethicknessofthetapedbeddingshallbe0.8mm. The minimumthickness of extruded bedding measured inaccordancewith Annex D shall notfall belowthe valuegiven in Table 4to Table18, asappropriate, byanamount more than (20 %+0.2mm).

The thickness and width of aluminium strip, determined in accordancewith G.6, shall not dill valuesspecifiedintheappropriatetablebymorethan1o%. Thetensilestrength of aluminium strip,when tested in accordancewith G.4, shall benot less han145N/mm

BSI25February2004

BS546YA1997

10.4 Joints

11 Oversheath

12Cablemarking

The ends of each factory length of cablehaving three or more cores of conductor size 25mm?and above shall bemarked redor green.The end at which the sequence of core colours,as specified in Clause7,is clockwise shall bemarked red and theotherend shall bemarked green.

oBSI25February200

BS 5467:1997

12.2Externalmarking The external surface of all cables conforming to this British Standard shall be legiblym followingelements.

Themarkingoftheitemsa)tod)shall bebyembossingorindentingontheoversheath For cables withtabulated approximate overall diametersgreaterthan15mm,items a),b)andc)shall appear,inanys sequencethatisdeemedneithertoconfusenorconflict,ontwoor moreprimarylinesalong theaxisof the cables,approximately equallyspaced around thecircumferenceof thecable. Itemsd)ande)shall appeareitherononeof theprimarylines,oronasecondarylineorlines,inany sequencethatisdeemedneitherto confusenorconflict. NorE3(Itemsd)ande)neednotbothappearonthesameline. For cables with tabulated approximate overall diameters up to and including 15 mm,the elements ofthe marking shallbedisposed as forcables of greaterthan 15mm diameterexcept thatthe marking foritems a),b)andc)shallappearononeormoreprimarylines. Theletters and figures shall consist of uprightblock characters withaminimumheight of3mm The distance betweenthe end of one element ofmarking andthe beginning of the next identical element ofmarkingshallbenotgreaterthan550mmforitemsa),b)andc)andnotgreaterthan1100mmforitems a)ande). Conformityshall becheckedbyvisual examinationandmeasurement. 12.3Identificationofyearofmanufacture Ameans of identifying theyear of manufactureshall be provided throughout thelength of cable,eitherby markingorbyanidentificationthread. If theidentification is by internal marking.thedistancebetweenthe end of one mark and thebeginning of thenextmarkshallbenotgreaterthan550mm. Iftheidentification is bymarking on the surface,the maximum distance between marks shall be not greaterthanl1oomm. 12.4Themarkofanapproval organization If the mark ofan approval organization is used it shall be provided throughout thelength of the cable eitheronthesurfaceorasanidentificationthread. Ifthemarkis applied to thesurfaceofthecable,itshallbeintheform ofsymbol(s)specifiedbytheapproval organization, and the maximum distance between marks shall benotgreater than1ioo mm. If the mark is in theform ofan identification thread,it shallbe as specifiedbythe approval organization

BSI25February2004

BS546YA1997

12.5Additionalmarking

13Endsealing

Before dispatch, the manufacturer shall cap the ends of the cable in order to form a seal to prevent the ngressofwaterduringtransportationandstorage.

14Scheduleoftests

15Test conditions

Ib.lAmbienttemperature Tests shall be performed at an ambient temperature of (20+15)°C unless otherwisespecified fortheparticulartest. 15.2Frequencyand waveformofpowerfrequencytestvoltages Unless otherwise specified in the particular test, thefrequency of the alternating test voltag the rangeof49Hz to 61HzThewaveform shall be substantially sinusoidal

Ib.lAmbienttemperature Tests shallbeperformed at an ambienttemperatureof(2015)Cunless otherwisespecifiedinthedetails ortheparticulartest. 15.2Frequencyandwaveformofpowerfrequencytestvoltages Unless otherwise specified in theparticulartest, the frequencyof the alternating test voltages shall be in therangeof49Hzto61Hz.Thewaveform shalibesubstantiallysinusoidal

OBSI25February2004

17Sampletests

BS 5467:1997

18Typetests

18.I General

BSI25February2004

BS 54671997

OBSI25February2004

BS 5467:1997

able3Compatibilityrequirements

BSI25February2004

BS 5467:1997

BSI25February2004

BS 54671997

OBSI25February2004

BS 5467:1997

C BSI25February2004

BS 54671997

OBSI25February2004

BS 5467:1997

BSI25February2004

BS 54671997

Tablei86oo/loooVarmouredauxiliarycableswithstrandedcopperconductor

OBSI25February2004

AnnexA(informative)

BS 5467:1997

A.iGeneral The cables specified in this standard aredesigned to be installed in air,orfor burial in free draining soil conditions. Where the cables are to be laid in any other environment, reference should be made to the cable manufactiter

A.2 Voltage rating

A3 Hazardous areas

Where cables are required tobe installed in areas classified as hazardous,i.e.potentiallyexplc atmospheres.referenceshould bemadetoBsEN60079.14(

BSI25February2004

BS 54671997

A.4 Current ratings

OBSI25February2004

B.6Compound filling

BS 5467:1997

B.7Earthing of armour

Provision should be made for earthing the armour to the main earth system at the supply end by means of a metallic bond of adequate conductance,the bonding connection being asshiort and straight as possible Special precautions maybenecessaryto eliminate therisk of corrosion,especially corrosiondue to the use ofdissimilarmetals.

Provision should be made for earthing the armour to the main earth system at the supply end by means of a metallic bond of adequate conductance,the bonding connection being asshiort and straight as possible Special precautions maybenecessaryto eliminate therisk of corrosion,especially corrosiondue to the use ofdissimilarmetals.

B.8Test after installation

A voltage test after installation is not a requirement of this standard, but if a test is made it should be

TableB.2Testvoltagesafterinstallatio

During the test, the voltage should be increasedgraduallyto the full value and maintained continuously for 15 min. The test should be made between conductors and between each conductor and armour. Nobreakdownshouldoccur. Sequencetesting maybe used to reduceoverall testingtimefor multicoreauxiliary cables,as indicated inAnnexK. Thetest voltages given in TableB.2 areintended for cables immediatelyafter installation and not for cables that havebeen in service. When testing is required aftercables have been in service, regardless of service duration,the manufacturer should be consulted for the appropriate test conditions, which depend ontheindividualcircumstances.

AnnexC(informative) Informationtobeprovidedwithenguiryororder

hefollowinginformation should begiven with an enquiryor order: a)thenumberofthisBritishStandard: b)lengthofcablerequiredandindividualdrumlengths,ifimportant c)voltagedesignation (see Clause4andA.2); d)numberof cores; e)sizeofphaseconductorl: f)conductormaterial (i.e.copperoraluminium): g)typeofconductor (i.e.stranded orsolid.shaped orcircular)

BSI25February2004

BS546YA1997

AnnexD(normative)

For measurements of thethickness ofinsulation,bedding and oversheath listed in Table2,t from one end of each drum length of cable selected forthetest,discarding anyportion which suffereddamage.

For measurements of thethickness of insulation,bedding and oversheath listed in Table 2, takea sample from oneend of each drumlength of cable selected for thetest, discarding any portion which mayhave suffereddamage.

OBSI25February2004

JB/T 12845-2016 汽车空调用电动压缩机BS 5467:1997

BSI25February2004

BS 5467:1997

resistanceofconductor andarmourfor s aluminiumwirearmonr

BSI25February2004

BS5467:1997国932A29969'0U82589'029Ci9426.%98829428692292:089'019088893992:02399'069099009039.98089'0890000329'010090'923OTwnrurtuny898'016'1T660'0T0900GT'T808782528cBSI25February2004

BS 5467:1997

GB/T 37036.4-2021 信息技术 移动设备生物特征识别 第4部分:虹膜Annex M (normative)

BSI25February2004

©版权声明
相关文章