GBT 51296-2018 英文版 石油化工工程数字化交付标准.pdf

GBT 51296-2018 英文版 石油化工工程数字化交付标准.pdf
VIP全站资料免积分下载
没有资源,无法下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:37.5 M
标准类别:其他标准
资源ID:266651
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

GBT 51296-2018 英文版 石油化工工程数字化交付标准.pdf

2.2Plant objects and documents shall be correlated with the plantbreakdown structure. relationmaybeestablishedaccordingtoFigure4.2.2

Figure 4.2.2 Correlation of plant objects and documents with plant breakdown structu

QGHX 0008S-2015 昆明贵华祥食品有限公司 方便食品4.2.3The plant breakdown structure and its data structure associated with plant objects and documents maybe established inaccordancewithAppendixAofthis standard

4.3Class library

4.3.1The class library shall include information such as plant object class,attribute,UoM class and lype of discipline and document as well as their correlation. The logical structure and hierarchy of the class librarymaybeestablished accordingtoFigure 4.3.1

s.1The class library shall include information such as plant object class,attribute,UoM class e of discipline and document as well as their correlation. The logical structure and hierarchy of ss librarymay be established according toFigure4.3.1.

4.4Plantobjectnumberingspecification

.1The rules on plant object tag shall be specified in the plant object tag specification to meet uirementsofrapidretrievalandlocation. .2The plant object tag shall be unique and meet the requirements of rapid retrieval and location

Document naming and numbering specificatio

4.6Deliverables specification

Quality audit specif

4.7.1Audit rules for the integrity,accuracy and consistence of data,documents and 3D models shall be developed inthequalityauditspecification. 4.7.2The template of quality audit report shall be prepared according to the audit rules in the quality auditspecification

dit rules for the integrity,accuracy and consistence of data,documents and 3D models shall be inthequalityauditspecification. ne template of quality audit report shall be prepared according to the audit rules in the quality fication

5Deliverycontentandform

5.lGeneralrequirements

5.1 General requirements

5.2.1ThedelivereddatashouldincludeinformationsuchasvaluesandUoMofplantobjectattributes 5.2.2The delivered data shall be organized according to the requirements ofthe class library 5.2.3Thedalacontentsofplantobjectshould includethebasic informationofengineering,procurement constructionandotherstages

Theelectronicfilesshallnotcontain any linkstootherdocuments

5.43D model

5.4.1The 3Dmodel tobedelivered shallmeet the requirements ofdelivery scope,content and levelo detailagreed intheinformationdeliveryscheme 5.4.2The 3Dmodel information to be delivered shall be consistent withtheinformationinothe delivereddataanddocuments. 5.4.3The 3D model to be delivered shall be retrieved and displayed correctly in the delivery platform 5.4.4The 3D model to be delivered shall be based on a unified coordinate system and coordinat origin. 5.4.5The3Dmodel tobedeliveredshould includea visual volume ofinterference checking 5.4.6The3D model to be delivered shall not contain information irrelevantto delivery,such as emporaryinformationandtestinformation

5.5Deliveryform

5.5.1Digital delivery should be handed over in the pattern of delivery platform or information model. 5.5.2Thehandoverpatternofdeliveryplatformshallmeettherequirementsofplatforminformation organization. 5.5.3Thehandoverpatternof informationmodel shall conformtotheorganizationrulesof information modelagreed intheinformationdeliveryscheme

Deliveryprocess

6.1Information delivery policy

6.1.1The information delivery strategy shall specify the objectives of information delivery and the organizations,workscopeandresponsibilitiesoftheparticipants. 6.1.2The information delivery strategy shall specify the laws,regulations and standards to be followed. 6.1.3The information delivery strategy shall specify theorganization,storage and delivery patlerns. 6.1.4The informationdeliverystrategy shall specifytheacceptancecriteria. 6.1.5The information delivery strategy shall include the workflow of information delivery,which shouldbecarried outaccordingtoFigure6.1.5

Figure 6.1.5 Workflow of information delivery Task JContent/result Conditions

6.1.6The information delivery strategy shall include the qualitymanagement scheme

6.2Informationdeliverybasis

6.3Informationdeliverysolution

.3.lTheinlormationdeliveryschemeshalldetailrelevantconlentsaccordingloiheinlormation eliverystrategy and informationdelivery basis.Thefollowing contents shall be included: 1Objectivesofinformationdelivery 2Organization,workscopeandresponsibilities, 3Criteriato be followed. 4Informationsystemadopted. 5Deliverycontents,organization,storageanddeliverypatterns 6Scheduleofinformationdelivery. 7Workflowofinformationdelivery 5.3.2Theinformationdeliveryschemeshallnotbeimplementeduntil itisapprovedbytheowner

6.5Informationhand

6.5.1Theinformationhandovershallbecarriedoutinaccordancewiththedeliverypatternanc scheduleagreedintheinformaliondeliveryscheme 6.5.2Theelectronic file listofdelivery information shallbeprovidedduringtheinformationhandover, andthelistshall includefilename,format,description,issuedate,version,etc

6Informationaccepta

6.6.1Thedeliveryinformationacceptanceshallbecarriedoutaccordingtothedeliverableslistofdata documents and3Dmodels. 6.6.2Thedelivery informationacceptanceshall verifythe integrity,accuracyandconsistencebasedon theinformationdeliverybasis 6.6.3Thedelivery information acceptanceshall includethefollowing items

7Deliveryplatform

7.1Functionrequirements

Function requiremen

7.2Openrequiremen

AppendixA Plantbreakdown structureand itsdatastructure associatedwithplantobjectsanddocuments

A.0.1 The data elements describing the plant shall meet the requirements of Table A.0.1. TableA.0.1Dataelements of theplant

A.0.2Thedataelementsdescribingtheprocessunitshallmeettherequirementsof TableA. TableA.0.2Data elements oftheprocess unit

A.0.3The data elements describing the utility and auxiliary facilities shall meet the requirements of TableA.0.3

Table A.o.3Data elements of the utilityand auxiliary facilities

0.4The data elements describing the area shall meet the requirements of Table A.0.4 TableA.0.4Dataelements ofthearea

Table A.0.5Data elements of plant objects

A.0.6The data elements describing the document shall meet the requirements of Table A.0. Tahle A.0.6 Data elements of documents

AppendixBDatastructureofclasslibrary

B.0.1The data elements describing the plant object class shall meet the requirements of Table B.0.1. TableB.o.1Data elements of plant objectclass

Table B.02Data elements of attributes

.3Thedata elements describing the correlationbetween plant object class and attributes shall n requirementsofTableB.0.3

B.0.4ThedataelementsdescribingtheUoMclassesshallmeetther Table B.0.4Data elements of UoM classes

Table B.0.5Data elements of UoM

.6Thedataclementsdescribingthecorrelationbetweenmeasurementclassesandunitsofmcast nt shallmeettherequirements of TableB.o.6. Table B.0.6Data elements of correlation between UoM classes and UoM

B.0.7The data elements describing discpline shall meet the requirements of Table B.0.7. TableB.0.7Data elements of discpline

B.0.8The dala elemenis describing document type shall meet the requirements of Table B.0 TableB.o.8Dataelements ofdocumenttype

Table B.0.9Data elements of discpline document type

.ioThedataelementsdescribingthecorrelationofplantobjectclasswithdisciplineanddocum eshall meet therequirements ofTableB.o.1o. TableB.0.1oData elements of correlation of plant object class with discipline and document type

AppendixCClassificationandpropertyoftypicalplantobject

C.0.1 The classification of typical plant object class should meet the requirements of Table C.0.1

Table C.o.(continued)

Table C.0.continued

Table C.0.l(continued)

C.o.2The general attributes describing the plant object class should meet the requirements of Table C02

Table C.0.2General attributes of theplant object cla

C.0.3The attributes describing the vessel should meet the requirements of Table C.0.3 Table C.0.3Attributes ofvessel

C.0.4The attributes describing the tray column should meet the requirements of Table C.0.4 Table C.0.4Attributes oftray column

Table C.0.4(continued)

Table C.0.5Attributes of shell and tube heat exchang

Table C.0.5(continued)

Table C.0.6Attributes of air cooled exchange

Table C.0.6(continued)

C.0.7The attributes describing power pumps should meet the requirements of Table C.0.7. TableC.0.7Attributes ofpowerpumps(centrifugal pumps)

Table C.0.7(continued

C.0.10The attributes describing the facilities of fire water system should meet the requirements Table C.o.10.

TableC.0.10Attributes ofthefacilities forfirewate

Table C.0.10(continued)

C.0.11 The attributes describing the piping should meet the requirements of Table C.0.11 Table C.o.1lAttributes of piping

C.0.12The attributes describing the safety relieving elements should meet the requirements of Table C.0.12

0.12The attributes describing the safety relieving elements should meet the requirements hle.0.12

Table C.0.12Attributes of safety relieving elements

0.13Attributesofpressure/differentialpressuretransm

Table C.0.13(continued)

C.0.14The attributes describing control valve should meet the requirements of Table C.0.14 Table C.0.14Attributes of control valve

Table C.0.14(continued)

C.0.15 The attributes describing the power transformer should meet the requirements of Table C.0.15.

C.0.15 The attributes describing the power transformer should meet the requirements of Table C.0.15.

JJF 1578.2-2016试行 网络预约出租汽车移动卫星定位终端计程计时检测方法 试行0.15The attributes describing the power transformer should meet the requirements of Ta 15

Table C.0.15Attributes of power transformer

C.0.16The attributes describing the frame should meet the requirements of Table C.0.16. Table C.0.l6Attributes offrame

C.0.16Theattributesdescribingtheframe reouirementsol TableC.0.16 TableC.0.16Attributesofframe

C.0.17 The attributes describing buildings should meet the requirements of Table C.0.17 Table C.0.17Attributes of buildings

AppendixDTypicaldeliverycontentsofdocuments

GB/T 9438-2013 铝合金铸件D.0.1The delivery list of general engineering(AA)documents should meet the requirements of TahleD.O1

©版权声明
相关文章