NFPA70-2008美国国家电气规范(英文版).pdf

NFPA70-2008美国国家电气规范(英文版).pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:NFPA70-2008
文件类型:.pdf
资源大小:8.3 M
标准类别:建筑工业标准
资源ID:263727
VIP资源

NFPA70-2008标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

NFPA70-2008美国国家电气规范(英文版).pdf

NATIONAL ELECTRICAL CODE

Pe s e giesl npa nitted without license from IH

GB/T 21972.2-2012 起重及冶金用变频调速三相异步电动机技术条件 第2部分YZP系列起重及冶金用变频调速三相异步电动机(轴流风机冷却)NATIONAL ELECTRICAL CODE 2008 Edition

NATIONAL ELECTRICAL CODE

Chapter 8CommunicationsSystems

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL CODE COMMITTEE

NATIONAL ELECTRICAL CODE COMMITTEE

These lists represent the membership at the time the Committee was balloted on the final text of this edition. Since that time, changes in the membership may have occurred. A key fo classifications is found at the back of this document

Technical Correlating Committee

Committee Scope: This Committee shall have primary responsibility for documents on minimizing the risk of electricity as a source of electric shock and as a potential ignition source of fires and explosions. It shall also be responsible for text to minimize the propagation of fire and explosions due to electrical installations.

ohn D.Minick,Chai

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL CODE COMMITTEE

Gil Moniz, National Electrical Manufacturers Association, MA [M] (Alt. to J. D. Minick) AIfredo M Ramirez, Underwriters Laboratories Inc., IL [RT] (Alt. to K. P. Boyce) John W. Troglia, Edison Electric Institute, WI [UT] (Alt. to N. F. LaBrake, Jr.) Nonvoting Ark Tsisserev, City of Vancouver, Canada Rep. CSA/Canadian Electrical Code Committee

Gil Moniz, National Electrical Manufacturers Association, MA [M] (Alt. to J. D. Minick) AIfredo M Ramirez, Underwriters Laboratories Inc., IL [RT] (Alt. to K. P. Boyce) John W. Troglia, Edison Electric Institute, WI [UT] (Alt. to N. F. LaBrake, Jr.) Nonvoting Ark Tsisserev, City of Vancouver, Canada Rep. CSA/Canadian Electrical Code Committee

Raymond W. Weber, Chair State of Wisconsin, WI [E] Rep. Intermational Association of Electrical Inspector

NATIONALELECTRICAL CODE 2008 Edition

Melvin K. Sanders, Things Electrical Co., Inc. (TECo., Inc.), IA [U] Rep. Institute of Electrical & Electronics Engineers, Inc. John E. Sleights, St. Paul Travelers, CT [1] Alternates Shane M. Clary, Bay Alarm Company, CA [M] (Alt. to S. E. Egesdal) Adam D. Corbin, Corbin Electrical Services, Inc., NJ [IM] (Alt. to L. S. Ayer) Danny Liggett, Dupont Company, TX [U] (Alt. to D. A. Pace) T. David Mills, Bechtel Savannah River, Inc., SC [U] (Alt. to M. K. Sanders) Mark C. Ode, Underwriters Laboratories Inc., NC [RT] (Alt, to T. J. Guida)

NATIONAL ELECTRICAL CODE COMMITTEE

Roger S. Passmore, Davis Electrical Constructors, Inc., Sc [IM] (Alt. to S. J. Owen) Marty L. Riesberg, IBEW Local Union 22, MD [L] (Alt. to P. J. Casparro) George A. Straniero, Tyco/AFC Cable Systems, Inc., NJ [M] (Alt. to L. Easter) Robert J. Walsh, City of Hayward, CA [E] (Alt. to R. P. Owen) Nonvoting Edward C. Lawry, Oregon, WI [E] (Member Emeritus)

James M.Naughton,Chair IBEW Local Union 103, MA [L] Rep. International Brotherhood of Electrical Worke

Ronald J. Toomer, Chair Toomer Electrical Company Inc., LA [IM] Rep. National Electrical Contractors Association

Ronald J. Toomer, Chair

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL CODE COMMITTEE

Joseph P. DeGregoria, Underwriters Laboratories Inc., NY [RT] (Alt. to C. Mello) Ronald Lai, FCI Electrical, NH [M] (Alt. to G. J. Steinman) Paul J. LeVasseur, Bay City JEATC, MI [L] (Alt. to D. Hammel) Richard E. Loyd, R & N Associates, AZ [M] (Alt. to M. J. Brett, Jr.) Michael E. McNeil, FMC Corporation/Bio Polymer, ME [U] (Alt. to P. Dobrowsky) Nathan Philips, Integrated Electronic Systems, OR [IM] (Alt. to R. J. Toomer)

Paul R. Picard, Tyco/AFC Cable Systems, Inc., MA [M] (Alt. to R. Temblador) Elliot Rappaport, Electro Technology Consultants, Inc., FL [U] (Alt. to D. C. Mohla) Phil Simmons, Simmons Electrical Services, WA [M] (Alt. to D. Brender) David A. Williams, Delta Charter Township, MI [E] (Alt. to M. J. Johnston) Nonvoting Robert A. Nelson, Canadian Standards Association, Canada [RT]

Paul R. Picard, Tyco/AFC Cable Systems, Inc., MA [M] (Alt. to R. Temblador) Elliot Rappaport, Electro Technology Consultants, Inc., FL [U] (Alt. to D. C. Mohla) Phil Simmons, Simmons Electrical Services, WA [M] (Alt. to D. Brender) David A. Williams, Delta Charter Township, MI [E] (Alt. to M. J. Johnston) Nonvoting Robert A. Nelson, Canadian Standards Association, Canada [RT]

Scott Cline, McMurtrey Electric, Inc., CA [IM] Chal Rep. National Electrical Contractors Association

Articles 320,322,324,326,328,330,332,334,336,338, 340,382,394,396,398

NATIONAL ELECTRICAL CODE 2008 Ed

NATIONAL ELECTRICAL CODE COMMITTEE

Alternates William B. Crist, Houston Stafford Electric Company, TX [IM] (Alt. to C. J. Fahrenthold) James D. Erwin, Celanese, Ltd., TX [U] (Alt. to G. L. Runyon) Rogers Hester, Jr., Encore Wire Limited, TX [M] (Alt. to G. A. Straniero) James K. Hinrichs, State of Washington, WA [E] (Alt. to G. D Rogers) Jacob Killinger, Underwriters Laboratories Inc., IL [RT] (Alt. to J. J. Cangemi)

Samuel R. LaDart, City of Memphis, TN [L] (Alt. to H. C. Brown) David Mercier, Southwire Company, GA [M] (Alt. to J. M. Daly) Dennis A. Nielsen, Lawrence Berkeley National Laboratory. CA [U] (Alt. to H. R. Stewart) Peter Pollak, The Aluminum Association, Inc., VA [M] (Alt. to T. Edwards) Thomas H. Wood, Cecil B. Wood Inc., IL [IM] (Alt. to M. D. Adams)

Articles 342,344,348,350,352,353,354,356,358,360,362,366,368,370,372, 374,376,378,380,384, 386, 388, 390, 392, Chapter 9, Tables 1 through 4, Annex C

Julian R. Burns, Chair Burns Electrical/Quality Power Solutions, Inc., NC [IM] Rep. Independent Electrical Contractors, Inc.

Julian R, Burns, Chair Burns Electrical/Quality Power Solutions, Inc., NC [IM] Rep. Independent Electrical Contractors, Inc.

NATIONAL ELECTRICAL CODE

Robert A. McCullough, Chai

NATIONAL ELECTRICAL CODE COMMITTEE

Paul W. Myers, Innovene LLC, OH [U] (Alt. to S. Sengupta) Donald R. Offerdahl, North Dakota State Electrical Board, ND [E] (Alt. to R. A. McCullough) Rhett A. Roe, IBEW Local Union 26 JATC, MD [L] (Alt. to R. D. Belisle)

James T. Dollard, Jr., Chail IBEW Local Union 98, PA [L] Rep. International Brotherhood of Electrical Worker

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL CODE COMMITTEE

Thomas E. Moore, City of North Royalton, OH [E] (Alt. to R. G. Fahey) Arthur S. Neubauer, Colonial Pipeline Company, GA [U (Alt. to P. S. Hamer) George J. Ockuly, O'Fallon, MO [M] (Alt. to V. J. Saporita) Charles L. Powell, Eastman Chemical Company, TN [U] (Alt, to W. D. Glover) Arthur J. Smith, II, Waldemar S. Nelson & Company,. Inc., LA [U] (Alt. to L. F. Saunders) Russell A. Tiffany, Johnson Controls, Inc., PA [M] (Alt. to R. L. Bunch)

Timothy N Croushore, Chai Allegheny Power, PA [UT] Rep. Electric Light & Power Group/EE

NATIONAL ELECTE

NATIONAL ELECTRICAL CODE COMMITTEE

Thomas H. Wood, Chair Cecil B. Wood Inc., IL [IM] Rep. National Electrical Contractors Association

David Mascarenhas, Canadian Standards Association Canada [RT]

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL CODE COMMITTEE

Ted H. Schnaare, Rosemount Incorporated, MN [M] (Alt. to L. E. Massey) John L. Simmons, Florida East Coast JATC, FL [L] (Alt. to M. J. Bernsen) Donald W. Zipse, Zipse Electrical Engineering Inc., PA [U] (Alt. to J. D. Cospolich) Nonvoting Timothy J. Pope, Canadian Standards Association, Canada [RT] Eduardo N. Solano, Estudio Ingeniero Solano S.A. Argentina [SE] Fred K. Walker, U.S. Department of the Air Force, FL [U] Rep. TC on Airport Facilities

Underwriters Laboratories Inc., NY [RT] DonaldJ.Talka,

NATIONAL ELECTRICAL CODE COMMITTEE

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL CODE COMMITTEE

Robert E. Wisenburg, Coates Heater Company, Inc., [M] (VL to 680) (Alt. to Lee L. West) Nonvoting Andrew M. Trotta, U.S. Consumer Product Safety Commission, MD [C] Douglas A. Lee, U.S. Consumer Product Safety Commission, MD [C]

Articles 545, 547, 550, 551, 552, 553, 555, 604, 675, Annex D, Examples D11 and D12

8 Editior ATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL CODE COMMITTEE

David W. Johnson, CenTex IEC, TX [IM] (Alt. to W. B. Bowman) Kent Perkins, Recreation Vehicle Industry Association, VA [M] (VL to 550, 551, 552) (Alt. to B. A. Hopkins) Michael J. Slifka, PFS Corporation, WI [M] (VL to 550, 551, 552) (Alt. to J. Mikel) Raymond F. Tucker, Consulting Professional Engineer/RADCO, CA [RT] (VL to 545, 550, 551, 552) (Alt. to M. L, Zieman) Eugene W. Wirth, Underwriters Laboratories Inc., WA [RT (Alt. to T. R. Lichtenstein)

NEPA Electrical Engineering Division Technical Staff

Chai National Infrastructure Institute. NH [L

NB/T 10440-2020 风力发电机定子绕组绝缘结构评定规程 耐湿热性Committee Scope: This Committee shall have primary responsibility for documents on minimizing the risk of electricity as a source of electric shock and as a potential ignition source of fires and explosions. It shall also be responsible for text to minimize the propagation of fire and explosions due to electrical installations

ommitteeScope:ihisCommitteesnall Ior documents on minimizing the risk o electricity as a source of electric shock and as a potential ignition source of fires and explosions. It shall also be responsible for text to minimize the propagation of fire and explosions due to electrical installations.

Copyright National Fire P Protection Association

GB/T 39848-2021 平板显示器色域测量方法Pe s e giesl npa nitted without license from IH

NATIONAL ELECTRICAL CODE

ARTICLE 90INTRODUCTION

©版权声明
相关文章