万豪设计英文标准(2007)DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL(客房走道).pdf

万豪设计英文标准(2007)DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL(客房走道).pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:0.6 M
标准类别:其他标准
资源ID:258709
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

万豪设计英文标准(2007)DS-CY-Asia-2007June-M07_Guestrooms,corridors,EGL(客房走道).pdf

Example:48mSuitePlan

1.Bathroom Fixtures<15B>

2.Bathroom:

June2007 7A

DL/T 707-2014 HS系列环锤式破碎机GuestroomCorridors&SupportSpaces

GuestroomCorridors&SupportSpaces

Table of Contents

Marriott Confidentialand Proprietary Information

The contents of the Design Standards are confidential and proprietary to Marriott International, Inc. and may not be reproduced, disclosed, distributed or used without the express permission of an authorized representative of Marriott. Copyright, Marriott International, Inc., unpublished material. All rights Reserved

GuestroomCorridorsandSupportSpaces

GuestroomCorridorsandSupportSpac

B.GuestroomCorridors

D.Ice Service

1. Program: Locate ice service convenient to guests in a central location, such as the retail store.Sensitively plan and locate to minimize exposure(noise and views)from guestroom corridor or public area.As an alternate,ice may be provided by RoomService,depending on the local marketand custom. 2. Ice Dispenser: Provide ice dispensing unit (not bin type) to ensure the sanitation of the ice. 3. Size / Area: . Entry: Minimum 0.9 m (3 ft.) wide . Ice Machine Area: Minimum 2 m² (20 sq. ft) for ice machine/dispenserwhenrequired

G.Exit Stairs

QYXMG 0001S-2015 沂水县小马哥食品有限公司 菇肉酱ExecutiveGuestLounge(EGL)

Table of Contents

The contents of the Design Standards are confidential and proprietary to Marriott International, Inc. and may not be reproduced, disclosed, distributed or used without the express permission of an authorized representative of Marriott.

Copyright, Marriott International, Inc., unpublished material. All rights Reserved

riott Confidentialand ProprietaryInformati

GA/T 774-2019 指掌纹特征规范ExecutiveGuestLounge

B.Entrance/ Fover

©版权声明
相关文章