ASME Y14.1-2020 确定尺寸及规定公差.pdf

ASME Y14.1-2020 确定尺寸及规定公差.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:20.1 M
标准类别:机械标准
资源ID:256550
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

ASME Y14.1-2020 确定尺寸及规定公差.pdf

3 TERMS AND DEFINITIONS

TERMSANDDEFINITIONS

3.1 Assembly

3.2 Associated List

DB13T 1254-2010 对虾养殖病毒病防疫技术规范associated list:atabulation ofengineering informatior pertaining to an item depicted on an engineering drawing or by a set of drawings (e.g, application list data list, index list, parts list, wire list) (ASME Y14.34).

.3 Commercial and Government Entity (CAGE)

3.4 Contractl

3.5 Contractoi

3.6 Design Activity

design activity: an organization that has, or has had responsibility for the design of an item (ASME Y14.100).

lesign activity:an organization that has,or has had esponsibilityfor the design ofanitem (ASMEY14.100)

3.6.1 Current Design Activit

currentiy responsible for the design of an item. This may be the original design activity or a design activity to which the design responsibility has been transferred (ASME Y14.100).

3.6.2 Original Design Activity

original design activity: the design activity originally responsible for the design and identification of an item whose drawing number and activity identification is shown in the title block of the drawings and associated documents (ASME Y14.100)

3.7 Design Activity Ildentification (DAl)

design activity identification: The application of a unique identifier that distinguishes an activity or organization from anotheractivity or organization.Examples ofactivity identification include activity name, activity name and address,or CAGE Code (ASME Y14.100),

3.8 Digital Data

3.9Document

3.10 Drawing

3.11 Drawing Format

drawing format: the arrangement and organization o information within a drawing.This includes such features as the size and arrangement of blocks, notes, lists, revision information, and use of optional or supplemental blocks [ASMEY14.100]

2DrawingGraphic Shee

3.13 Engineering Data

3.14 Field of Drawing

product definition of an item (ASME Y14.100).

eld of drawing: the area of a drawing that contains the oroduct definition of an item (ASME Y14.100).

3.16 Original

original: the current design activity's reproducible drawing or dataset on which is kept the revision record recognized as official (ASME Y14.100).

original: the current design activity's reproducible drawing or dataset on which is kept the revision record recognized as official (ASME Y14.100).

3.18 Procuring Activity

3.18 Procuring Activity

procuring activity: the customer (ASME Y14.100)

3.19Referenced Docume

referenced documents: design activity standards, draw ings, specifications, or other documents referenced on drawingS or lists (ASME Y14.100)

3.20 Segment

are usedforspecific processing (e.g.,microfilming or other form of reproduction),

321 Standard

standard: a document that establishes technical criteria, methods, processes, and practices (ASME Y14.100).

standard: a document that establishes technical criteria methods, processes, and practices (ASME Y14.100). 22LComnauStrndard

Standardization Docume

standardization document: a document developed for the purpose of standardizing items, materials, processes, or procedures (ASME Y14.100)

3.23Acronyms

Acronyms Terms ASME The American Society of Mechanical Engineers CAGE Commercial and government entity DAI Design activity identification UOS Unless otherwise specified

3.24 Abbreviations

4DRAWINGSHEETSIZES

4.1 Margins

4.1.1 Format Margins. The format margin sizes showi inapplicablefigures are the minimum required NOTE: Additional design activity nonproduct definition data ma be added within the drawing format margins

4.1.1 Format Margins. The format margin sizes shown in applicable figures are the minimum required NOTE: Additional design activity nonproduct definition data may be added within the drawing format margins

4.2 Drawing Sheet Sizes

4.2.1Metric Drawing Sheet Sizes

5.1 Drawing Sheet One

5.2ContinuationSheets

The sizes of blocks specified herein are minimum size andmaybe increased to accept sizeandletteringon drawing formats in accordance with ASME Y14.2. For block content, see para. 6.2. Additional blocks may be added

5.4 Lettering

The size and style of lettering printed on drawing ormatsshallbe inaccordancewithASMEY14.2.

Line widths shall be in accordance with ASME Y14.2 When contrasting line widths are used, the following guidelines may be used:

(a) Thick Lines (1) borderlines (2) outline of principal blocks (3) main divisions of blocks (4) segment match lines (b) Thin Lines (1) divisions ofparts lists and revision history block (2) minor subdivisions of the title block and supple entaryblocks (3) zonemarkers

5.7SegmentAlignment(Optional)

6 TITLE BLOCKS

6.1 Location

6.2 Contents

ntinuation Sheet Title Bld

7REVISIONHISTORYBLOCK

7.1 Location

7.2 Contents

BREVISIONSTATUSOESHEETSBLOCK

9ASSOCIATEDLISTS

See ASME Y14.34 for sheet sizes and formats of asso

See ASME Y14.34 for sheet sizes and formats of asso ciatedlists

1OADDITIONALDATABLOCKS(OPTIONAL

SN/T 3694.14-2013 进出口工业品中全氟烷基化合物测定 第14部分:塑料制品 液相色谱-串联质谱法10.1 Angle of Projection Block

10.2 Dimensioning and Tolerancing Block

10.3 Application Block

IIADDITIONALDRAWINGNUMBERBLOCKS (OPTIONAL) L1.1 Margin Drawing Number Block

11.2Elongated Drawing Sheet Size Segmen

12 DATAMARKINGS

the remaining sheet size (2) Format margins do not include added protective or binding margins. See paras. 4.1.2 and 4.1.3.

JR/T 0073-2012 金融行业信息安全等级保护测评服务安全指引NOTES (1) Zone sizes shall be equal, no less than 1 in., and no more than 5.50 in. (2) Format margins do not include added protective or binding margins. See paras. 4.1.2 and 4.1.3

1) Zone sizes shall be equal, no less than 1 in., and no more than 5.50 in

©版权声明
相关文章