ASME B30.4-2020 门座起重机和基座式起重机.pdf

ASME B30.4-2020 门座起重机和基座式起重机.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:49.2 M
标准类别:机械标准
资源ID:256548
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

ASME B30.4-2020 门座起重机和基座式起重机.pdf

SECTION X:ADDITIONAL GUIDANCE

sheaves, sprockets, or drums (d) the type of attachments (e) the number, size, and arrangement of sheaves or otherparts ) environmental conditionscausing corrosionor

INTENTIONALLY LEFT BLANK

cally controlled, manually controlled, and if free fall is available () advice that slings and lifting attachments are part of the load. If the manufacturer elects to include the lower loadblockaspartoftheload,theratingchartshall so state.

GB/T 33915-2017 农产品追溯要求 茶叶1.3.4Backward Stability

Each crane shall be provided with informational litera ture, including, but not limited to, the following

Each crane shall be provided with informational liter

members or locations it is advisable to periodically observe or testfor the purposeofdetectingtheonset of metal fatigue, the loosening of prestressed bolts, or wear affecting the ability of the crane to support rated loads.

Hoist drums shall be in accordance with ASMEE

Hoist drums shall be in accordance with ASME B30.30

1GeneralRequirements

fromtheeffectsof windperASCESEI7whenthe crane is out of service

(a) Crane trucks shall be fitted with sweeps extending to the top of the rail and placed in front of the leading wheels in either direction. (b) Truck wheels shall be guarded. (c) Means shall be provided to limit the drop of truck frames in case of wheel or axle breakage to a distance that will not cause the crane to overturn

(a) Crane trucks shall be fitted with sweeps extending to the top of the rail and placed in front of the leading wheels in either direction. (b) Truck wheels shall be guarded. (c) Means shall be provided to limit the drop of truck frames in case of wheel or axle breakage to a distance that will not cause the crane to overturn

End terminations shall be in accordance with ASME B30.30

A metal receptacle should be provided for the storage ol small hand tools and lubricating equipment. It should be secured in the cab or on the machinery platform

Aportable fire extinguisher, with basicminimur extinguisher rating of 1o BC, shall be installed in th cab or at the machinery housing.

JB/T 12592-2016 低低温高效燃煤烟气处理系统control located within reach of the operator

Lubrication points should be accessible without the ecessity of removing guards or other parts with tools inlessequippedforcentralizedlubrication

Engine exhaust gases shall be piped and discharged wayfromtheoperator.Exhaust pipes shall be guarded or insulated to prevent contact by personnel when performing normal duties.

18.6 Wind Velocity Devic

Fuel tank fller pipes shall be located or protected so as not to allow spillage or overflow to run onto the engine, exhaust, or electrical equipment of the machine being fueled

1.18.9Hydraulicand PneumaticLineProtection

Exposed lines subject to damage shall be protected insofar as it is practical.

1Preventive Maintenand

HG/T 4770-2014 电力变压器用防腐涂料Rope inspection, replacement, and maintenance sh he in accordance with ASME B30.30.

©版权声明
相关文章