ASME A112.18.8-2020 水管下水道系统用内嵌式生活排污阀.pdf

ASME A112.18.8-2020 水管下水道系统用内嵌式生活排污阀.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:10.2 M
标准类别:水利标准
资源ID:256547
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

ASME A112.18.8-2020 水管下水道系统用内嵌式生活排污阀.pdf

Values are stated in U.S.Customary units and in the International System considered as the standard. In this Standard, gallons (U.S. liquid) per minute is abbreviated gpm, and liters (metric liquid) per minute is abbrevia L/min.

considered as the standard. In this Standard, gallons (U.S. liquid) per minute is abbreviated gpm, and liters (metric liquid) per minute is abbreviated /min

1.3 References

1.4Defintions

AQ/T 2053-2016 金属非金属地下矿山监测监控系统通用技术要求ENERALREQUIREMENTS

2.1Material

2.4 Valve Inlet

RAL NOTE: The above images are for illustrative purposes only.

2.5 Valve 0utlet

2.6 Threaded Connections

3.1WaterwayFlowRate

(a) 1/ in. (31.8 mm): 9.5 gpm (36 L/min), valve alone on wash basin, bidet (b) 1/2 in. (38.1 mm): 13.5 gpm (51 L/min), valve alone on bath (c) 1/ in. (38.1 mm): 11.1 gpm (42 L/min), valve alone on kitchen sink

(a) 1/4 in. (31.8 mm): 9.5 gpm (36 L/min), valve alone on wash basin, bidet

3.3AirwayFlowRate

B.4RecoveryFromanExcessBackPressure(Inversion)Condition

3.5 Leak Tightness

5.1 Test Method. The valve shall be tested in accordance with the hydrostatic pressure test in ASTM F409 using a rnal pressure of 25 psi (172 kPa) for 1 hr. .5.2 Performance Requirements. The valve shall show no evidence of leakage and demonstrate air tightness

3.6 Thermal Cycling

ResistancetoHousehold

esistancetoChemicalsa

3.11LifeCycle

4 MARKING, IDENTIFICATION, AND INSTRUCTI

HJ 709-2014发布稿 建设项目竣工环境保护验收技术规范 纺织染整 发布稿4MARKING,IDENTIFICATION,ANDINSTRUCTIONS 4.1 Marking and Identification

MARKING,IDENTIFICATIONANDINSTRUCTIONS 4.1 Marking and Identification

4.2 Instructions

both of the following:

INTENTIONALLY LEFT BLANK

A112ASMESTANDARDSRELATEDTOPLUMBING

TB/T 3350.2-2014 动车组用不锈钢 第2部分:管材ASME Services

technical inquiries ed tothis code or standard is sho right page. All technical inquiries must be submitted in writing to the

©版权声明
相关文章