YBT 4264-2020 英文版 桥梁缆索钢丝用盘条.pdf

YBT 4264-2020 英文版 桥梁缆索钢丝用盘条.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:2.7 M
标准类别:交通标准
资源ID:250537
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

YBT 4264-2020 英文版 桥梁缆索钢丝用盘条.pdf

Thetestitems,samplequantity,samplingmethodandIocationofeachbatchof wi ds shall be in accordance with Table 6.

tems, sample quantity,sampling method an

QXKL 0002S-2015 云南省宣威市昆仑食品厂 火腿酱YB/T42642020

YB/T42642020

YB/T42642020

7.2 Scale inspection method

cales weight on samples(kg) X1000(k tal samples weight(kg)

Scales weight on samples(kg Total samples weight (kg)

GB/T 35031.6-2019 用户端能源管理系统 第6部分:管理指标体系8Inspectionrule

8.1Inspection and acceptance

Deliveryinspectionand acceptance of wire rod shall be carried out by the quality supervision department of the manufacturer. The purchaser reserves the right to carry out any inspection and acceptance for any test item specified in this standard.

8.2 Batch rule

re rods shall be inspected in batch.Eachbatch consists of wire rodwith the same grade he same heat number,the same dimension and the sameheat treatment (or hot rolling)

8.3 Retest and iudging rule

ifoneitemdoesnot conformtothecorrespondingprovisionsof thisstandard,the unqualified coil shall be removed. Double sampling and reexamination from the same batch shall be done. If they are still unqualified, they should be deemed as unqualified product. The remaining coils from the same batch shall be checked one by oneand the qualified ones can bedelivered.

YB/T42642020

GB/T 3866-1983 西式糕点质量检验方法Packaging,marking and quality certificate of wire rod shallbeinaccordancewith GB/T 2101

©版权声明
相关文章