gots_implementation_manual_6_0_en1.pdf

gots_implementation_manual_6_0_en1.pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:0.7 M
标准类别:其他标准
资源ID:248633
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

gots_implementation_manual_6_0_en1.pdf

In case new animal/fish tests for an input would have been carried out in a legally binding registration procedure (such as REACH), it shall be demonstrated that these tests were mandatory, and no alternative method would have been accepted. Other ways and in all othe cases of new animal/fish tests performed, the corresponding input shall not be approved for GOTS

...AllchemicalinputsintendedtobeusedtoprocessGOTSGoodsaresubjecttoapprovalbya GOTS Approved Certifierprior to their usage.Preparations shall have been evaluated and theirtrad names registered on approved lists priorto their usage by a GOTSApproved Certifierwho is authorised by the Global Standard gGmbH for the specific accreditation scope:“Approval of textile auxiliary agents (chemical inputs) on positive lists" (Scope 4).

Chemicalformulators shall implementappropriateandeffectiveproduct stewardshippractices. Adequate systems for producttesting and quality assurance shall be in place. Interpretation: Product Stewardship practices may include, but not limited to: Controlonraw materialsforconsistent qualityand hazardous substances Process control duringformulation for consistent quality and hazardous substances. QualityAssurancepractices informulationofpreparations. Testing plan forraw materials, preparations and intermediate products, if any. Stafftrainingforrisk assessment. Adequate evaluation of preparations for release of hazardous substances during intended use. Implementation: The requirements of this Section shallbe implemented by 01March 2022

Implementation

QYAS 0001S-2015 云南褚马氏科技有限公司 速冻鲜花饼TherequirementsofthisSectionshallbeimplementedby01March2022andformulatorsare expected to have been first inspected through GOTS Approved CBs (Scope 4) by 01 July 2022

.... Following GOTS criteria shall be included in the audit of a chemical supplier: Section 2.4.10 Section2.4.11, (seeManualforCoD requirements) Section3.6 Interpretation of Section2.4.11in this context: Wastewater CoD values in case of a chemical formulator shall be below 250 ppm or shall meet legal requirements, whicheveris lower.

2.4.6 Dyeing

2.4.6 Dyeing

2.4.6 Dyeing and 2.4.7 Printing

Reguirements foradditional fibre materi

9.2 RequirementsforAccessories

2.4.10Environmental management

he available data andprocedures need to include

theirconsumptionperkgoftextileoutput target goals and procedures to reduce energy and water consumption per kg of textile outd

...Certified Entities are required to collect information on sources of greenhouse gas emissions (GHG) within their own operations and identify means for reduction for each source ....

2.4.11Wastewater Treatment

Note:CODrequirementsforGOTSaremeasureding/kgofprocessedoutput. ypicalCoDtes reports contain CODvalues ing/lit of effluent/discharge.Inspectors will need to calculate the C ing/kgofprocessedoutputbasedoncalculationgivenaboveinthesecases.

...Wastewater analyses shall be performed and documented periodically at norma capacity.

Suggested test parameters for treated wastewater should include: AOx (with a limit of 5 mg/l) and Heavy Metal residues as per following table

2.4.12Storage,packagingandtransport

2.4.12.1B2BtradeofGOTSgoods

2.4.12.2Retail (B2C)trade of GOTS goods

..." Textile fibre materials used for packaging, shall follow one of these three conditions: ... c) meet criteria for permitted additional fibres (Section 2.4.9.1) but without limitation on percentage and meet RSL criteria as in Section 2.4.16" ...

Interpretation: Fibres permitted as additional fibres in Section 2.4.9.1 can be used for textile packaging materials withoutrestrictiononpercentage Forexample: Packaging material made of 100% lyocell fibre and 100% recycled polyester can be used. Packaging material made of virgin polyester or conventional cotton or acrylic fibres cannot be used

ertifiedEntitiespurchasingorganic fibres shall receive andmaintain Scope Certificatesand/or action Certificates (where applicable) of the producer and trader(s) (if applicable)forthe Organic iction Standard for the whole quantity purchased."....

For the purposes of traceability and operation of the Centralised Database System (under development),informationaboutfirstcertified organicfibre input is required to be collectedand maintainedbythe Certified Entity.Data would need to be maintained in a suitable document,such as a spreadsheet, in a prescribed format.The format is being developed in harmonisation with Textile Exchange and will contain details of Scope Certificate(s) of fibre producer(s) / producer group(s) along with quantity of purchased fibre(s),

Limit valuesfor residues in GOTS Goods

.Foradequatemplementationandassessmentoftnefollowingspecificcriteriaadnerencetotne correspondingInternational LabourConventions of the International LabourOrganisation (ILO)and OECDshallbeassured.

Assessmentwhile conducting inspections andaudits." Interpretation: Approved Certifiers shall assess risk associated with operations based on local and sectorial parameters and documentthe same. FurtherGuidance: For integrating better practices in the textile supply chains, the Approved Certifiers and Certifiec Entities may further refer to OECD Due Diligence Guidance and United Nations Universal Declaration of Human Rights

3.8 REMUNERATION AND ASSESSMENT OF LIVING WAGE GAP

3.8 REMUNERATION AND ASSESSMENT OF LIVING WAGE GAP

Further guidance:

Certified entities are required to collect and analyse data aboutworkers'remuneration and report what thelowest paid worker is earning and the average earning for each group (e.g., level) of workers. Living Wages as estimated by Global Living Wage Coalition shallbe used as adefinition benchmark.Wheresuchbenchmarksareunavailable,orinadditiontothesebenchmarks,Template 5:FairRemunerationQuickScanasavailablefromamforiBSClshouldbeused. Thistemplateshould beread/usedwiththe Section of the amfori BSCI System Manual onFair Remuneration (especiallytheauditing interpretation guidelines part lllandguidelines forproducers partIV)andtheAnnex9onHowtopromoteFairRemuneration. Certified Entities are encouraged to working towards closing the Wage Gap which may be required, overtime, in the future. Reference: Template5:FairRemuneration Quick Scan

3.9WORKINGTIME

3.9.3 Overtimeshallbevoluntary,shallnotexceed12hoursperweek,shallnotbe demanded on a regular basis and shall not represent a significantly higher likelihoo occupationalhazards.

3.12 SOCIAL COMPLIANCE MANAGE

4 QUALITY ASSURANCE SYSTEI

AUDITINGOFPROCESSING,MANUFACTURINGANDTRADINGSTAGES

Further Guidance for“Exceptions for Traders and Retailers'is provided as following

..“BasisforauthorisationbytheGlobalStandardgGmbHisanaccreditationofthecertifierin accordancewiththeGlobalStandardgGmbHdocument'ApprovalProcedureandRequirementsfol

."BasisforauthorisationbytheGlobalStandardgGmbHisanaccreditationofthecertifierin accordancewiththeGlobalStandardgGmbHdocument'ApprovalProcedureandRequirementsfoi

FurtherGuidance: For risk assessment in textile supply chains, Approved Certifiers and Certified Entities should further refertoOECDDue DiligenceGuidance. Reference OECD (2018),OECDDue Diligence Guidance for Responsible Supply Chains in the Garment and FootwearSector,OECDPublishing,Paris

QualitativeGMOscreeningofcottonwithintheGOTSsupplychainshallbeperformedby appropriately qualified (such as: ISO 17025)testing laboratories using ISo IWA 32 protocol. Thi protocol establishes that GMO screening is only possible on unprocessed (raw/greige) cotton.

Notwithstanding the above, GOTS recognises that testing techniques evolve and improve over time. Ar techniques other than the Iso IWA 32 protocol and / or testing on processed cotton can be employed only after technically supported external verification and subsequent confirmation of such techniques by GOTS

Notwithstandingtheabove,GOTSrecognisesthattestingtechniguesevolveand improveoverti techniques other than the ISO IWA 32 protocol and / or testing on processed cotton can be empl only after technically supported external verification and subsequent confirmation of such technid GOTS

ould be abundantly clearthat testing of GOTS Goods (for residues)and GOTS approved inputs are rely within the responsibility and ambit of Certified Entities and Approved Certifiers, based on their ific assessment of risk in each case. However, purely for guidance, test parameter matrices are estedbelow

SuggestedtestparametermatrixforGOTSChemicalInputs

estedtestparametermatrixforGOTSGoods,

..... Adherence to relevant OECD guidelines shall be assured ....

Interpretation : OECD "Good Practice Guidance on Internal Controls, Ethics and Compliance" shall be th referencedocument.

...Only paper or cardboard tampon applicators arepermitted..

DBS13 003-2015 食品安全地方标准 阪崎肠杆菌和沙门氏菌检测3 Specific criteria forInputs

Fragrances and lubricants

6.2SPECIFIC REQUIREMENT

.. meet the specific legal (hygienic and GMP) requirements applicable for its products and in the country / region.

ApplicableLegislation

GB/T 13171.2-2022 洗衣粉 第2部分:试验方法Copyright:2020by Global Standard gGmbH

©版权声明
相关文章