疏散通道通用图(通桥(2009)8302).pdf

疏散通道通用图(通桥(2009)8302).pdf
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:13.4 M
标准类别:其他标准
资源ID:246663
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

疏散通道通用图(通桥(2009)8302).pdf

疏设通道分类拉号粒项标高(m)类面形式钢游号直径(mm)长度(mm)非抗露6度(0.05g),7度(0.1g),7度(0.15g)1、II,8度(0.2g)1类场地)(分组第二立柱基础、立柱材料表二KZ4KZ1KZ2KZ2KZ15.019.6914.48.025.187.3411.7e7440215028932150215057501683021502150215021502150289314130积数重量(kg))非8度区锅筋用量(kg)8度区钢篇用量(kg)框薇土总量(m3)2123.6152.95154.5198.88409.4552.95193.4162.82254.23132.69605.9352.9559.3352.95237.69123.61121.55257.82437.91304.1183.383.844.3010.423.423.84疏散通道分类aKZ2KZ2桂号桂顺标高(m)横面形式12.195.5110.52工钢能号复核a289321502893129505750179304840212975.37128.2161.8039.5552.95242.07125.4280.27128.88121.55574.13570.23395.99140.39759.09470.27762.1352.9552.95193.1762.82.52.9552.95254.23132.6984.9252.9552.95315.05105.86157.0263.67704.11436.21564.91392.2重量(kg)非8度区钢管用量(kg)8度区筛用量(kg)度土总量(m3)比例尺11.903.484.4610.77

疏最通道分类KZ4桂号粒顶标高(m)类面形式钢落号直径((mm)长度(mm)5.189.8514.532.847.8512.8618.1Z2101224502950169606150152906150n8重量(kg)非8度区钢篇用量(kg)8度区钢篇用量(kg)摄疑土总量(m3)52.95153.89184.54185.281598.219.64127.05184.541441.05872.79219.6467.128.2198.091185.08822.97生。29.626.9321.6728.54疏歡通通分类桂号样标高(m)裁面形式,本工程数量表仅供参考使用。混凝土强度等规为C3510.0215.03铜筛号直径(mm)K度(mm)14445088508850615044045088502916252.9552.95181.0089.4798.0998.09157.47184.541645.571000.91219.642113.981297.18900.82重量(kg)非8度区钢能用量(kg)8度区制管用量(kg)需度土总量(m3)比例尺23.8030.40

©版权声明
相关文章