标准规范下载简介:
内容预览由机器从pdf转换为word,准确率92%以上,供参考
重庆市建设工程施工机械台班定额(2018年版)9905050109905040509905040499050403990504029905040199050307905030490503039050202990502019905010500503005020905010490501039050102090501010编码0.30机械名称性能规格50250100830200中中中小小·小**小小小小小224.00555.69307.09265.89216.84196.61610.94406.03264.65234.74192.37186.98180.26270.50241.26218.86223.37205.51190.87178.37165.04元64.4734.8821.5815.34·10.59105.1317.9651.5726.7816.837.375.653.5714.889.823.487.372.491.671.311.09元折旧费8.0820.488.255.113.632.5037.3018.309.505.972.612.011.274.232.790.993.311.130.760.580.48元检修费152.3722.5461.3838.0210.136.9899.5948.8625.3715.946.975.373.3911.297.452.648.843.022.031.551.28维护费元5.垂直运输机械9.1027.189.109.109.109.1027.1827.189.109.109.10,9.109.109.109.109.109.109.109.109.109.10费用组成元142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80142.80人工费元23.52148.3950.6849.2835.8424.64198.94117.3251.1044.1023.5222.0520.1388.2069.3059.8551.9546.9734.5123.0310.29元1.191.191.191,191.191.191.191.191.191.191,191.19120.00机上人工1.191.191.191.191.191.191.191.191.19工日6.75kg汽油人工及燃料动力用量5.64kg柴油211.9833.6072.4070.4051.2035.20284.20167.6073.0063.0033.6031.5028.76126.0099.0085.5074.2167.1049.3032.9014.700.70kw.h电0.34kg游4.42m3*
SN/T 4833-2017 出入境检验检疫证单填制规范0601010编码605010601020机械名称性能规格5150250大***小中小小大中中小2547.232281.332177.951961.011846.49503.64426.20397.62313.96286.49254.30236.43215.57338.12331.23297.22250.94226.31204.25428.90310.96265.67225.87332.12271.43232.72155.15117.8093.8665.2558.3025.2416.9914.9812.327.0050.1647.1226.6522.0910.265.9261.4033.1719.7614.11折旧费48.2632.1724.4321.0914.6613.133.821.5711.3068.8756.295.673.372.7710.615.984.962.311.3313.427.464.433.17检修费183.19149.73128.3785.5764.9860.3241.9362.2426.8818.1113.6111.196.3418.6517.519.878.1831.9417.7510.54维护费6.混凝土及砂浆机械6.103.517.5431.7131.7131.7131.7110.6231.7110.6210.6210.6210.6210.6231.7110.6210.6210.6210.6210.62费用组成10.621500.001500.001500.001500.001500.00166.56166.56166.56166.56166.56166.56166.56166.56166.56166.56166.56166.56166.56166.56166.56166.56166.56166.56人工费123.87303.88268.60188.12139.28130.10106.0986.7778.9970.3945.1632.9723.4859.7457.7256.4538.5330.4616.3175.4053.7623.87163.012.5012.5012.5012.50120.00机上人工1.391.391.391.391.391.391.391.391.391.391.391.391.391.391.391.391.391.39工日6.75汽油5.64柴油工及燃料动力用量661.50434.11383.72268.74198.97185.86151.55123.96112.84100.5664.5147.1033.5485.3482.4680.6455.0443.5223.30176.95107,.7176.8034.10kw • h0.3
机械名称m3性能规格/h)1551.941519.951490.691403.951064.88417.113834,753668.262310.642160.872073.611838.061328.821303.281265.641015.471311.191280.741251.411232.381444.96971.10478.41481.49198.50180.861165.82895.06780.23854.0623.70685.81667.38108.492001.95708.32608.38114.77357.49325.85122.551902.611003.62912.12880.53373.36352.33296.64373.17366.28357.62354.77346.16343.54336.72240.35202.41折旧费132.11115.96112.26109.25104.3367.9058.5353.3421.7419.25284.02269.9351.7549.9842.0870.3469.0467.4166.8765.2464.7668.7841.3检修费99.6032.1312.3829.4053.99545.32518.27141.28284.44277.73275.50268.79266.81283.37202.25170.32维护费183.63161.18156.04151.8694.3881.3674.1471.6548.4842.93273.37248.45254.8147.39136.45114.88、80.80.80.2680.2628.5428.5428.54150300.300.00800300.00800.00800.00300.00300.00300.00150.00150.00150.00150.00150.00150.00150.00150.00人工费411.33366.99310.20237.226.8656514.32420.74391.5350.36200.619.16.9214.919.4518.8518.2516,7516.1515.55机上人工1.251.25120.00.25工日N256.75kg120.80116.4043.7867.62.42.35.55.64柴油人工及燃料动力用量10.3298.041.kg0.70kw·h电0.34
9908150209908150109908140109908130509908130490908130259081302090813005990812010990811020990811010990810030990810020990810010990809030990809020990809010990808020990808010908130409081303590813039081301590813010编码射流井点泵齿轮油泵高压油泵潜水泵真空泵机械名称油泵试压泵砂泵50FS37A50FS25规格型号9.5088642.52.5100204小小小小小小小小小小小小小小小22.98167.57213.5680.6427.0324.4223.2922.5721.4019.8618.1814.8278.30106.91122.8384.4052.9028.3523.37108.2649.54.60.2917.7558.15元48.303.723.643.40.2.932.772.611.352.226.894.3525.7715.327.015.702.458.847.70折旧费19.574.834.993.883.801.74元1.220.774.562.741.251,020.430.311.571.38检修费4.103.302.570.880.690.680.660.640.600.520.480.470.240.39元4.062.5617.1510.304.705.553.382.97维护费13.1210.589.562.682.102.072.011.951.821.581.461.430.731.302.341.69元8.44费用组成5.635.635.635.635.635.635.635.635.635.635.635.635.635.638.448.445.635.635.638.44元人工费元149.7793.60157.6414.0037.6615.1216.1037.7012.8512.1211.1110.9610.719.959.207.847.616.8768.7686.0363.0035.0017.5086.03元元机上人工120.00工日6.75汽油人工及燃料动力用量5.64kg柴油23.0017.3215.6615.3011.2010.8798.23213.95133.72225.20122.9090.0050.0025.0020.00122.9053.800.70kw·h21.6053.8518.3615.8714.2113.149.810.34游4.42电
· 9999111703991117025991117020991117015991117010991117005991116010991115020991115010991114010锁口管项升机991113010991112010超声波测壁机991111010991110010991109040991109030991117040991109020991109010991108010991107010991106010911170549111704591117030编码玉究潜水电钻机械名称(mm)D2.1m×7mD2.1mX7m管径性能规格80型75型8000800260024602400220020001650140012001000800600特特1460.37特1430.42特特4中X特特特特中*1604.651495.191337.85110.411137.781006.623991.323858.451559.563257.351186.792685.481839.251732.04631.13522.48324.91738.89683.88612.02478.93467.73134.6390.30632.00市号元1095.411020.68913.27466.85326.93319.28595:4634.83110.851772.071034.50996.91976.47504.39417.7937.1746.04597.2536.9128.62.197.8582.08264.73折旧费179.31167.08163.19159.84149.502.0438.9926.61425.45374.43284.91248.37143.4082.5776.4268.3953.5252.273.942.649.0728.0811.6534.67检修费4.90300.27294.11275.08151.93140.61125.8421.51130.39599.88527.95401.72350.20202.19329.93307.4355.0425.7540.56维护费98.4896.184.226.124.7358.8714.9719.1291.7338.0528.5440.77费用组成12.7519.125.635.63元399.60399.60544.80272.40272.40272.40272.40272.40999.60150.00214.80人工费元352.73193.97921.521124.111111.53780.01624.01413.42173.7126.8936.4769.5855.9044.8025.80元元120.00机上人工3.333.334.542.272.272.272.272.278.331.251.79工日6.75kg汽油163.39199.31197.08138.30110.64人工及燃料动力用量30.805.64kg柴油503.90277.10590.6038.4152.100.70kw·h99.4079.8664.0036.850.34kg游4.42电
991214010井点降水钻机991213010高压压风机车991212010991211010潜水减压仓991210010991209010真空滤油机9912080109912070309912070209912070109912060109912050109912040509912040409912040309912040209120401091203010991202040991202030991202020991202010991201050991201040991201030991201020991201010硅整流充电机反吸式除尘机通井机潜水设备箱式加热炉组合烘箱离心通风机轴流通风机鼓风机吹风机机械名称90A/190VD2FX1性能规格3006000t8200小小小小小小小2532.55746.84165.83258.12126.62137.17117.26'123.4015.9788.9466.869.71513.2773.0259.6825.40427.72232.19133.0083.00546.44514.17411.8840.96209.8972.5488.6722.36179.7922.0422.6404.8631.3598.0481.4717.96折旧费1.9820.6213.5916.553.75.838.937.898.082.6619.0015.7310.6454.0717.3914.4检修费0.8754.98.3.970.411.221.300.802.934.015.524.22.20.72.001.73.191.430.4153.9451.3034.05130.813.432.5227,06维护费2.1050.8155.581.291.380.853.04.531.1812.其他机械费用组成7.0310.627.038.44176.40300.00人工费1937.34304.003.9925.2012.928.21机上人工1.472.50120.00工日6.75汽油343.50人工及燃料动力用量53.90柴油5.70.h0.3