e+h Transmitter_FMU90 超声波液位计 英文版

e+h Transmitter_FMU90 超声波液位计 英文版
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:1.7M
标准类别:其他标准
资源ID:227815
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

e+h Transmitter_FMU90 超声波液位计 英文版

The sensors FDU80/80F/81/81F/82/83/84/85/86/96 are not available anymore

Endress+Hauser

Prosonic S FMU90

Prosonic S FMU90

FZ/T 93077-2011 环锭细纱机用导纱钩The HART signal is assigned to the first analog output. The second analog output does not carry a signal

Endress+Hauser

Prosonic S FMU90

PROFIBUS DP interface

Power supply

Power supply

Endress+Hauser

Prosonic S FMU90

Electrical connection

Endress+Hauser

Prosonic S FMU90

Endress+Hauser

Prosonic S FMU90

Prosonic S FMU90

1. Open the catch of the cover (e.g.by a screwdriver) 2. Pull the cover out by approx. 20 mm (0.79 in) . 3.The cover can now be opened. The cables can be inserted into the housing from above or from below. The pictures show the smallest housing version but are valid for the larger versions as well. If the instruments are mounted next to each other and if the sensor cables run in parallel, the synchronization terminals (39 and 40)mustbe interconnected (see sections→ 15'Terminal assiqnment'and→自19"Synchronization line")

Endress+Hauser

Endress+Hauser

ProsonicSFMU90

Terminal assignment

Endress+Hauser

Theterminalconfigurationdependsontheinstrum entversionordered.Thereisabasicterminalarea respective option has been selected in the product structure

Prosonic S FMU90

Endress+Hauser

Prosonic S FMU90

In this case, terminals 9/10/11 are not present on terminal area A

Endress+Hauser

Additional elements on the terminal areas

Prosonic S FMU90

Prosonic S FMU90

For details refer to Technical Information TI00396F/

Endress+Hauser

Endress+Hauser

Prosonic S FMU90

display and operating module

Endress+Hauser

Fortheversion of the connecting cable (3 m (9.8 ft)) is supplied. The cable must be connected to the display plug of the

Minimum diameter for cable bushing: 20 mm (0.79 in)

Prosonic S FMU90

Prosonic S FMU90

Connection of a temperature sensor

Endress+Hauser

Endress+Hauser

Prosonic S FMU90

RD Cable color= Red

Endress+Hauser

Moreinformationcanbefoundinthefollowingdocul 1TI01029T

Prosonic S FMU90

Prosonic S FMU90

Ex area, with connection via terminal box RDCable color = Red

More information can be found in the following documents: TI01029T

Endress+Hauser

Endress+Hauser

Prosonic S FMU90

Endress+Hauser

Prosonic S FMU90

Prosonic S FMU90

Performancecharacteristics

Environment

Endress+Hauser

Prosonic S FMU90

Mechanicalconstruction

Endress+Hauser

Prosonic S FMU90

Prosonic S FMU90

The dimensions of the field housing aluminium are the same for all instrument versions To open the housing, a minimum mounting distance of 55 mm (2.17 in) is required on the left

Using the following table, determine how many optional terminal areas this instrument version contains.

Endress+Hauser

Prosonic S FMU90

Sum = 4 (4 optional terminal areas

Endress+Hauser

10 20 30 40 5060 70 80 90 100110120

Prosonic S FMU90

Prosonic S FMU90

Prosonic S FMU90

Endress+Hauser

Field housing aluminium with DIN rai

Prosonic S FMU90

Prosonic S FMU90

Operability

Display (Examples)

Endress+Hauser

Prosonic S FMU90

Basic setup

Endress+Hauser

Prosonic S FMU90

Prosonic S FMU90

CertificatesandApprovals

External standards and quidelines

DL/T 5590-2021 电网工程施工招标文件与合同编制导则Endress+Hauser

Prosonic S FMU90

Orderinginformation

Accessories

Endress+Hauser

Prosonic S FMU90

DB34T 2290-2015 水利工程质量检测规程Endress+Hauser

Prosonic S FMU90

©版权声明
相关文章