群体别墅施工组织设计

同润碧水湾三期别墅工程

XX集团建设发展有限公司

第一章编制说明·········································································································1

第二章工程概况·········································································································2

GB/Z 34044.10-2020 自动化系统与集成 制造运行管理的关键性能指标 第10部分:数据获取操作序列描述.pdf2.1工程性质········································································································2

2.2工程地理位置及周围环境情况····································································2

2.3工程简况········································································································2

2.3.1建筑简况······································································································2

2.3.2结构简况······································································································3

2.4工程标高········································································································3

2.5工程目标········································································································3

2.5.1质量目标······································································································3

2.5.2进度目标······································································································3

2.5.3文明施工管理目标······················································································4

2.5.3竣工资料······················································································4

第三章施工布署·········································································································5

3.1施工总体布置·····························································································5

3.1.1材料仓库布置······························································································5

3.1.2生产区布置·································································································5

3.1.3文明设施布置·····························································································6

3.1.4工程用水、用电布置·················································································6

3.2施工总平面布置图·····················································································7

第四章总工期及施工总进度计划表········································································8

4.1总工期编制说明·····························································································8

4.2总工期控制网络····························································································9

4.3施工工期保证计划措施················································································10

4.4工期计划管理技术措施················································································10

4.5进度控制的内容····························································································13

4.6施工总进度计划表························································································13

第五章施工机械配备表····························································································14

5.1土建机械表····································································································14

5.2安装机械表····································································································15

5.3计量检测器具表····························································································16

第六章分部分项工程施工方案···············································································17

6.1总体设想、各阶段施工部署····································································17

6.1.1工程施工总体布局设想············································································17

6.1.2基础阶段施工设想····················································································17

6.1.3上部结构施工设想····················································································18

6.1.4装饰阶段施工设想···················································································19

6.1.5施工技术方案及具体施工方法·······························································20

6.2工程测量技术方案···················································································23

6.2.1测量总则···································································································23

6.2.2测量仪器选用···························································································23

6.2.3平面轴线控制测量···················································································23

6.2.4高程控制测量···························································································23

6.4土方开挖···································································································24

6.4.1基坑土方开挖施工技术措施···································································24

6.5基础施工技术措施···················································································25

6.5.1基础工程施工流程···················································································25

6.5.2垫层···········································································································26

6.5.3钢筋工程···································································································26

6.5.4模板工程····································································································26

6.5.5混凝土工程································································································27

6.5.6地下防水工程····························································································28

6.6主体结构施工方案···················································································29

6.6.1施工工艺流程···························································································29

6.6.2模板工程···································································································30

6.6.3钢筋工程···································································································32

6.6.4土建与安装配合······················································································33

6.6.5混凝土工程······························································································34

6.6.6砌体工程施工技术措施··········································································38

6.6.7脚手架工程······························································································39

6.7装饰工程施工技术措施··········································································41

6.7.1抹灰工程··································································································42

6.7.2外墙涂料··································································································43

6.7.3室内涂料墙面··························································································44

6.7.4室内瓷砖墙面··························································································44

6.7.5水泥砂浆地面··························································································45

6.7.6细石混凝土地面······················································································46

6.8门窗工程施工技术措施··········································································48

6.8.1施工准备··································································································48

6.8.2施工工艺流程··························································································49

6.8.3施工操作要求··························································································49

6.8.4安装门窗及门窗玻璃··············································································49

6.8.5质量标准··································································································50

6.9屋面工程施工技术措施············································································50

6.9.1对于卷材材料进场的要求······································································50

6.9.2施工工艺流程··························································································51

6.9.3对基层的要求··························································································51

6.9.4整体防水卷材铺贴施工要点··································································51

6.10沉降观测计划························································································52

6.10.1设置数量与位置····················································································52

6.10.2观测数据的建立····················································································52

6.11水电安装施工技术方案········································································53

6.11.1施工的组织布置和协调管理································································53

6.11.2施工配合································································································54

6.11.3施工技术及资料管理············································································54

6.11.4给排水部分····························································································57

6.11.5电气部分································································································59

6.11.6质量保证措施························································································61

6.11.7安全措施·································································································63

6.11.8文明施工保证措施·················································································65

6.12室外总体工程··························································································65

6.12.1施工布置································································································65

6.12.2施工步骤安排························································································66

第七章质量等级及质量保证措施··································································69

7.1自报工程质量···························································································69

7.2确保本工程达到合格工程的质量保证体系及实施措施·······················69

7.2.1质量目标管理体系网络···········································································69

7.2.2质量保证体系要素及职能分配表···························································70

7.2.3确保工程质量的保证实施措施·······························································71

7.2.4具体技术质量控制措施···········································································73

7.2.5产品保护···································································································76

7.3质量保证计划纲要···················································································77

7.3.1质量体系···································································································77

7.3.2合同评定···································································································79

7.3.3文件和资料控制·····················································································80

第八章安全及文明施工措施···········································································81

8.1安全管理一般原则···················································································81

8.2项目安全保证体系要素及职能分配表···················································81

8.3确保安全施工的技术组织措施·······························································82

8.3.1安全责任···································································································82

8.3.2安全教育···································································································83

8.3.3安全设施验收···························································································83

8.3.4安全检查···································································································83

8.4安全施工保证措施···················································································83

8.4.1脚手架的防护···························································································83

8.4.2安全网的搭设···························································································85

8.4.3临边防护···································································································85

8.4.4洞口防护··································································································85

8.4.5施工通道的防护······················································································86

8.4.6施工机械的管理······················································································86

8.4.7施工用电安全··························································································88

8.4.8消防措施··································································································89

8.5文明施工保证体系及措施······································································90

8.5.1文明施工控制点······················································································90

8.5.2文明施工目标··························································································91

8.5.3文明施工总体管理措施··········································································91

8.5.4文明施工具体实施措施··········································································92

第九章环境保护措施······················································································95

第十章项目管理体系、管理职能及措施······················································96

10.1项目管理组织体系················································································96

10.2安全文明保证管理体系········································································97

10.3质量保证管理体系················································································98

10.4现场项目管理人员职能分配································································99

10.4.1经营财务部····························································································99

10.4.2工程技术部····························································································99

10.4.3质量安全部····························································································99

10.4.4材料设备部····························································································100

10.4.5综合办公室····························································································100

10.4.6计划管理员····························································································101

10.5项目管理人员岗位责任制····································································101

10.6项目管理措施························································································102

10.6.1总体管理措施························································································102

10.6.2工程项目计划管理················································································102

10.6.3工程项目质量管理················································································104

10.6.4工程项目安全管理················································································106

10.6.5工程项目技术管理················································································107

10.6.6工程项目经济管理················································································110

10.6.7工程项目材料管理················································································111

附表一施工现场总平面布置图

附表二施工现场用水平面布置图

附表三施工现场总平面布置图用电

附表四单体工程施工进度表

同润碧水花园三期别墅工程由XXXX房地产开发有限公司开发建设,XX九晟建筑设计研究院设计。本工程位于XX市松江区泗泾镇古楼路。该工程设计比较独特,是典型的群体别墅。本施工组织设计针对其地上、地下各分部分项工程进行编制。

本施工组织设计的编制依据如下:

1、同润碧水花园三期别墅工程投标文件;

2、同润碧水花园三期别墅工程建筑、结构及各专业施工图;

3、同润碧水花园三期别墅工程的地质勘探报告;

4、现行国家有关施工及地方性验收规范、结构规范;

5、政府有关法规、法令。

同润碧水花园三期别墅工程由47个单体组成,其中包括A1型别墅1栋;B1型别墅11栋;B2型别墅12栋;C2型别墅11栋;C3型别墅12栋;。本工程建设单位为XX房地产开发有限公司,设计单位XX九晟建筑设计研究院设计。

2.2工程地理位置及周围环境情况

同润碧水花园三期别墅工程工程建设基地位置处于XX市松江区泗泾镇古楼路。本工程“四通一平”工作已完善,施工用水、电位置业主已明确。

同润碧水花园三期别墅工程工程总建筑面积为15097m2。各类型工程简况见下表所示:

4、7、11.16、20、23、27、31、36、43、46

1、6、10、13、17、22、26、30、33、37、40、45

2、5、9、14、18、21、25、29、34、41、44

3、8、12、15、19、24、28、32、35、38、42、47

别墅工程工程设计使用年限为50年,抗震设防烈度为7度,安全等级为二级,耐火等级为二级。

本工程结构混凝土强度等级采用以下:

同润碧水花园三期别墅工程工程各单体工程±0.000标高相对于绝对标高如下:

独立别墅(A1):±0.000标高相对于绝对标高4.800

独立别墅(B2):±0.000标高相对于绝对标高4.800

独立别墅(B2):±0.000标高相对于绝对标高4.800

独立别墅(C2):±0.000标高相对于绝对标高4.800

独立别墅(C3):±0.000标高相对于绝对标高4.800

确保本工程一次性验收合格。。

确保本工程在总工期330日历天内完成,正式开工日期以建设单位书面通知为准。

2.5.3文明施工管理目标:

确保本工程安全重大事故为零,争创区文明标化工地。

技术资料管理做到分阶段同步完成,全部技术档案资料在竣工结算后一个月内移交建设单位归档。

根据本工程的特点,整个工程现场,即办公区、现场施工区。施工现场的临时道路布置尽量利用永久道路的位置,以避免材料上的浪费。现场总体布置如下:

3.1.1材料仓库布置

考虑到现场具体位置,准备在施工现场东北角布置临时仓库。搭设10间临时房作为别墅区材料仓库及值班室。具体布置详见施工现场总平面布置图。

食堂的设施、卫生要严格按照XX市有关规定进行搭设,确保卫生,并由专人负责临时设施的卫生保洁工作。

本工程根据需要进行场地规划和布置。具体详见施工现场总平面布置图。

由于现场需要进行气割操作施工,在施工场地内各布置一间3m*2m的氧气、乙炔间,两者间距必须满足安全要求搭设,用于存放氧气、乙炔瓶。明火必须远离这两间贮藏间,两者距仓库区、施工区不得小于25m,并设置明显标志。

在施工现场每处材料堆场处搭设2间36㎡水泥库,并用土填高300mm,水泥库外设有排水沟。

施工现场的材料堆场主要布置在西侧。

3.1.3文明设施布置

按文明施工及标准化的要求进行围护墙施工,确保安全的施工,沿建筑规划红线用围墙把整个施工场地封闭起来,根据目前已有围墙经行搭设。

现场的施工便道,按临设方案修改版实施。

考虑车辆进出场地的方便,以及最大限度地利用好有限的场地,在场地东侧的主出入口部位布置8m宽的大门,大门为钢管框架的铁大门,其中大门边扇开一扇行人小门,同时在大门处设置洗车台。

按临设方案修改版实施。

3.1.4工程用水、用电布置

根据业主提供水源位置,进水管采用φ50管,在各用水机械及主要车辆出入口提供出水阀门供其用水。应确保施工用水和混凝土养护用水。

现场生活用废水、雨水、污水利用现场基坑周围修筑的排水沟。

根据现场业主提供的电源位置,进入施工总电箱后分二路:一路至拟建住宅楼,一路至临时办公区,施工用电沿水电沟布设,水电沟内用黄砂填实,并用水泥砂浆找平。井架机械另设专门电箱,其余在各用电机械处布置电箱。登高用电配备登高专用电箱,电缆如过施工路面应埋地20cm,外套采用金属管。具体详见施工现场用电平面布置图。

3.2施工总平面布置图

第四章总工期及施工总进度计划表

1、本工程接业主进场通知后2天内进场,为便于总进度计划的编制,具体开工时间以业主书面通知为准,在330日历天内完成本工程的全部施工。

2、为确保本工程按期完成,将按照进度需要配备足够的劳动力和机械设备,组织工序之间的搭接流水施工。

3、由于本工程工期较紧,我们将采取一切措施,投入一定量的机械、设备,提供充分人力、物力,确保计划内完成所有工程。

4、根据工程特点,为保证分部分项工程的合理流水穿插和搭接,将合理组织劳动力、机械设备和物资材料的供应,编制相应的基础挖土和基础结构施工阶段、主体结构施工阶段、装饰和水电安装及总体配套阶段的分阶段进度控制计划,以确保整个工期目标的实现。

5、根据总进度计划和施工工艺流程的要求,合理组织机械设备材料的进场,做到预先安排、中途控制、及时退场;合理组织各工种施工操作人员的进场和适用,严格组织和控制好劳动力计划。

4.2总工期控制网络

4.3施工工期保证计划措施

1、在正式进场之前,制定详细的施工项目的总进度计划,同时,与业主和设计院进行协调,确定各方所配合事宜。

2、对各分包班组进行施工交底的同时,尤其对其施工的进度计划进行限定、交底,对各分包班组施工过程的进度严格的控制执行。

3、各分包班组根据项目总的进度计划表,设定详细的施工进度计划,同时进行与其它分包进度计划的协调。

4、每周对各班组的进度计划执行情况进行总结,同时对发生冲突的地方进行有效的协调,确保各自的下一步施工不受影响。

5、每半个月或是每个月对总计划进行对比,一旦发现有特殊情况要对总的计划进行相应的调整,以利于分包班组间施工配合。

6、制定具体的奖罚措施,单位工程按原计划提前完工,并达到总包要求的,则对其进行奖励,反之,对其进行处罚。

7、由项目经理统一监管项目总进度的执行情况,统计部门每天对项目的施工工程量进行统计整理,以确保每天所必须完成工程量。

8、加强施工现场的监督检查,在工程进场开工之前,项目各管理部门根据总进度计划,安排各自部门的项目工作计划,至项目部进行统一管理。在保证进度计划的情况下,必须保证工程的施工质量,不能以牺牲质量来取得计划的实现。

4.4工期计划管理技术措施

●认真研究设计图纸和总承包合同,做好各项编制工期计划必须信息的收集和分析工作,负责起草编制工期计划。

●负责给各单位送报计划书,纵向单位有业主、监理,横向单位有项目部有关部门及人员。

●负责下达计划任务,向施工管理及技术管理等有关人员分发作业计划,并督促有关人员贯彻执行作业计划。

●负责收集信息,做好项目实物工程和形象进度的统计工作,掌握施工的实际进度,分析施工情况并及时向项目经理汇报。

●负责计划调整工作,根据施工实际情况,主动及时提出修正计划的建议,并按项目经理的指示,修正下阶段的施工计划。

2、材料设备部负责编制项目的材料设备使用计划。

3、技术和工程部有关人员负责落实每周的作业计划,完成预定的实物工程量把握施工的形象进度,并每周向计划员反映形象进度情况。

4、计划编制内容分为月、旬、周作业计划,它是实现性计划,是将总计划具体细化后的计划安排,施工作业班组按此组织施工生产活动。

5、项目计划管理体系如下:

4.5进度控制的内容

进度控制报告内容主要包括:

(1)项目实际概况、管理概况、进度概要;

(2)项目施工进度、形象进度及简要说明;

(3)施工图纸提供进度;

(4)材料、设备、配应进度;

(5)劳务记录及预测;

(7)对业主和施工者的变更指令单等;

(8)其他影响施工进度计划实施的因素。

市政道路-冬季施工方案.doc4.6施工总进度计划表

施工总进度计划、各单体进度计划详见附表。

第五章施工机械配备表

09电站锅炉安全阀技术规程DLT 959-2014土建施工机械设备配备表

安装工程主要施工机械配备表

工程主要计量检测仪器配备表