NFPA 72-2019

NFPA 72-2019
积分0.00
特惠
积分0
VIP全站资料免积分下载
立即下载
同类资料根据编号标题搜索
文档
仅供个人学习
反馈
标准编号:
文件类型:.pdf
资源大小:3.8M
标准类别:建筑工业标准
资源ID:233862
VIP资源

标准规范下载简介:

内容预览由机器从pdf转换为word,准确率92%以上,供参考

NFPA 72-2019

2019 Editior

Oded Aron, Port Authority of New York & New Jersey, NY [U] Peter Binkley, Evax by Potter/ Potter Electric Signal, CT [M] Ihomas M. Chambers, Vector Security Inc., PA [IM] Rep. The Monitoring Association Joe L. Collins, Dallas/Fort Worth International Airport, TX [U Joseph Dafin, U.S. General Services Administration, DC [U] John C. Fannin III, SafePlace Corporation, DE [U] Charles E. Hahl, GHD Inc., VA [SE] Raymond N. Hansen, U.S. Department of the Air Force, FL [U] Bryan Lawrence Hoskins, Oklahoma State University, OK [SE] Waymon Jackson, University of Texas at Austin, TX [U] Scott Lacey, Lacey Fire Protection Engineering, AR [SE] Minfei M. Leng, Bird Technologies Group, NY [M] Ted Leventhal, Marktek Inc., PA [M] Derek D. Mathews, UL LLC, IL [RT]

COMMITTEE PERSONNEI

William E.Koffel,Chazr Koffel Associates. Inc.. MD [SE]

DL 5009.3-2013 电力建设安全工作规程 第3部分:变电站Daniel P. Finnegan, Secrela Siemens Industry, Inc., IL [M] Rep. National Electrical Manufacturers Association

James Mongeau, Space Age Electronics, Inc., MA [M] Rep. Automatic Fire Alarm Association, Inc. Wayne D. Moore, JENSEN HUGHES, RI [SE] Michael Pallett, Telecor Inc., Canada [M] Thomas J. Parrish, Telgian Corporation, MI [IM] Joseph Ranaudo, AFA Protective Systems, Inc., NY [IM] Rodger Reiswig, Johnson Controls/Tyco/SimplexGrinnell, FL [M] Jeffrey A. Scott, FP&C Consultants, Inc., MO [SE] Andrew J. Shear, Detech, Inc., NC [IM] Aviv Siegel, AtHoc, Inc./BlackBerry, CA [M] James P. Simpson, Electrical Training Alliance, MN [L] Rep. International Brotherhood of Electrical Workers Robert Anthony Ulizio, Georgetown University, DC [U] Andrew B. Woodward, Arup, MA [SE]

James Mongeau, Space Age Electronics, Inc., MA [M] Rep. Automatic Fire Alarm Association, Inc. Wayne D. Moore, JENSEN HUGHES, RI [SE] Michael Pallett, Telecor Inc., Canada [M] Thomas J. Parrish, Telgian Corporation, MI [IM] Joseph Ranaudo, AFA Protective Systems, Inc., NY [IM] Rodger Reiswig, Johnson Controls/Tyco/SimplexGrinnell, FL [M] Jeffrey A. Scott, FP&C Consultants, Inc., MO [SE] Andrew J. Shear, Detech, Inc., NC [IM] Aviv Siegel, AtHoc, Inc./BlackBerry, CA [M] James P. Simpson, Electrical Training Alliance, MN [L] Rep. International Brotherhood of Electrical Workers Robert Anthony Ulizio, Georgetown University, DC [U] Andrew B. Woodward, Arup, MA [SE]

Matthew Batbouta, Aldie, VA [SE] (Alt. to Charles E. Hahl) Christopher K. Constant, FP&C Consultants KC, LLC, MO [SE] (Alt. to Jeffrey A. Scott) Laura E. Doyle, U.S. General Services Administration, DC [U] (Alt. to Joseph Dafin) Aleksandr Frenkel, Port Authority of New York & New Jersey, NJ [U] (Alt. to Oded Aron) Raymond A. Grill, Arup, DC [SE] (Alt. to Andrew B. Woodward) Paul E. Mackins, U.S. Department of the Navy, CA [E] (Voting Alternate) David Madole, University of Texas at Austin, TX [U] (AlttoWiaumon

Richard J. Roux, NFPA Staff Liais.

2019 Edition

NATIONAL EIRE ALARMLAND SIGNALING CODE

[ENSEN HUGHES/Aon, CA [SE]

Jeffrey S. Hancock, Secretary Valero. TX [U

hard J. Roux, NFPA Staff Liaisor

2019 Edition

COMMITTEE PERSONNEI

Arthur S. Lee, U.S. Consumer Product Safety Commission, MD [C

Richard J. Roux, NFPA Staff Liaisor

laurice M. Pilette, Mechanical Designs Ltd., MA [SE Rep. TC on Residential Sprinkler Systems

NATIONAL EIRE ALARMLAND SIGNALING CODE

Richard J. Roux, NFPA Staff Liaisor

JENSEN HUGHES/AON Fire Protection Engineering, IL [SE Rep.JENSEN HUGHES

2019 Edition

COMMITTEE PERSONNEL

Todd Alford, System Sensor, IL [M] Rep. Automatic Fire Alarm Association, Inc. David Dressler, Minnesota Statewide Limited Energy JATC, MN Rep. International Brotherhood of Electrical Workers Michael L. Edwards, U.S. Architect of the Capitol, DC [U] Raymond A. Grill, Arup, DC [SE] Daniel M. Grosch, UL LLC, IL [RT] Paul Jennison, Forsyth County Georgia, GA [U] Doug Kline, Nowak Supply Fire Systems, IN [M] Rep. Fire Suppression Systems Association Neal W. Krantz, Sr., Krantz Systems & Associates, LLC, MI [IM] Rep. NFPA Industrial Fire Protection Section Steven P. Lewis, RFI Enterprises, CA [IM] David Madole, University of Texas at Austin, TX [U]

Kobert F.Accosa, Jr.,Arup, NY [SE] (Alt. to Raymond A. Grill) Jan Braam, UTC Climate, Controls & Security/Edwards, FL [M] (Alt. to Morris L. Stoops) Mark C. Hamilton, Siemens, Inc., NJ [M] (Alt. to Paul R. Strelecki) Neal W. Krantz, Jr., Krantz Systems & Associates, LLC, MI [IM] (Alt. to Neal W. Krantz, Sr.) James Mongeau, Space Age Electronics, Inc., MA [M] (AlttoToddAiford)

Richard I. Roux, NFPA Staff Liaisor

City of Boulder Fire Rescue. CO [E

City of Boulder Fire Rescue. CO [E

David E.Becker, Secretar Fire Equipment Service Company, KY [IM]

Bob D. Morgan, Fort Worth Fire Department, TX [E] David Newhouse, Gentex Corporation, MI [M] Rep. National Electrical Manufacturers Association Isaac I. Papier, Papier Consulting Group LLC, IL [SE] Maurice M. Pilette, Mechanical Designs Ltd., MA [SE] Andrew W. Poole, Poole Fire Protection, Inc., KS [SE] Robert P. Schifiliti, R. P Schifiliti Associates, Inc., MA [SE] Michael T. Schmitt, Long Grove Fire Protection District, IL [E] Rep. Illinois Fire Inspectors Association Daniel L. Seibel, Wolverine Fire Protection Company, MI [IM] Morris L. Stoops, UTC Fire & Security/Edwards, KS [M] Paul R. Strelecki, Siemens Building Technologies, Inc., NJ [M] John R. Swanson, Minnesota State Fire Marshal Division, MN [E

Leon Newsome, Cooper Notification, FL [M] (Alt. to David Newhouse) Warren E. Olsen, Fire Safety Consultants, Inc., IL [E] (Alt. to Michael T. Schmitt) Scott E. Panowitz, BFPE International, MD [M] (Alt. to Doug Kline) Jack Poole, Poole Fire Protection, Inc., KS [SE] (Alt. to Andrew W. Poole) Rich Rhome, Froula Alarm Systems, Inc., WA [IM] (VotingAltermate)

NATIONAL EIRE ALARMLAND SIGNALING CODE

Richard J. Roux, NFPA Staff Liaisor

Jack Poole, Chai Poole Fire Protection. Inc.. KS [SE

Jack Poole, Chai

Leonard Belliveau, Jr., Secretar JENSEN HUGHES, RI [SE] Rep. JENSEN HUGHES

2019 Edition

COMMITTEE PERSONNEL

Robert J. Allen, R.B. Allen Company, Inc., NH [IM] (Alt. to George W. Allen) Dwayne Griffith, Walmart Security Services, AR [U] (Alt. to Anthony W. Cole) Charles E. Hahl, GHD Inc., VA [SE] (Alt. to Isa Y. Saah)

Richard I. Roux, NFPA Staff Liaison

Martin Electrical Code Consultants. MA [SE eo F.Martin,.Jr., Gha

Martin Electrical Code Consultants. MA [SE eo F.Martin,.Jr., Gha

Hans Kristensen, Woodstock Fire/Rescue Department, IL [U] (Alt. to Jeffrey G. Knight) Leo J. Watts, Signal Communications Corporation, MA [M] (Alt. to Robert E. Lapham) Michael S. White, Siemens Building Technologies, OH [M] (Alt. to Max McLeod)

Hans Kristensen, Woodstock Fire/Rescue Department, IL [U] (Alt. to Jeffrey G. Knight) Leo J. Watts, Signal Communications Corporation, MA [M] (Alt. to Robert E. Lapham) Michael S. White, Siemens Building Technologies, OH [M] (Alt. to Max McLeod)

NATIONAL EIRE ALARMLAND SIGNALING CODE

Douglas M. Aiken, Lakes Region Mutual Fire Aid, NH [U] (Alt. to Raymond E. Bigelow) Shane M. Clary, Bay Alarm Company, CA [M] (Alt. to Jason Dupuis) Martin J. Farraher, Siemens Industry, Inc., IL [M] (Alt. to Sean P. Titus) Scott D. Henderson, Allianz Global Corporation & Specialty, MA [1] (Alt. to James S. Crews) Paul J. Olson, UL LLC, MN [RT] (Alt. to Steven A. Schmit) Thomas J. Parrish, Telgian Corporation, MI [U] (Voting Alternate)

Richard J. Roux, NFPA Staff Liaison

Steven P. Sargent, Keltron Corporation, MA [M] (Alt. to David A. Blanken) Randy H. Schubert, Ericsson, NJ [U] (Alt. to Richard G. Kluge) Michael Sherman, AES Corporation, MA [M] (Alt. to John Franklin Milliron) Michael G. Slossar, AT&T Digital Life, NJ [U] (Alt. to Roy Pollack) Deane E. Walker, Grayslake Fire Protection District, IL [E] (Alt. to Warren E. Olsen) Leo J. Watts, Signal Communications Corporation, MA [M (Alt. to Robert F. Buckley)

2019 Edition

COMMITTEE PERSONNEL

Timothy E. Adams, American Society for Healthcare Engineering IN [U] Rep. American Society for Healthcare Engineering Charles E. Brockett, Global Asset Protection Services, LLC, TX [1] Richard L. Carter, Siemens Industry, Inc., NJ [M] Louis Chavez, UL LLC, IL [RT] Franklin Chenoweth, Fireline Corporation, MD [M] Rep. Fire Suppression Systems Association Rick Heffernan, SDi, NJ [M] Rep. National Electrical Manufacturers Association Herbert B. Hurst, Jr., Savannah River Nuclear Solutions, LLC, SC U John Kelly, Washington DC Fire & EMS Department, MD [E] Robert H. Kelly, Fire Defense Equipment Company, Inc., MI [IM] J. David Kerr, Plano Fire Department, TX [E] Rep. NFPA Fire Service Section E. J. Kleintop, Johnson Controls/Tyco/SimplexGrinnell, PA [M] Peter A. Larrimer, U.S. Department of Veterans Affairs, PA [U]

J.Jeffrey Moore, Chair JENSEN HUGHES, OH [SE

J.Jeffrey Moore, Chair ENSEN HUGHES. OH [SE

James Murphy, Vector Security Inc., PA [IM] Rep. The Monitoring Association Robert Powers, East Providence Fire Department, RI [E] Michael J. Reeser, Santa Rosa Fire Equipment Service Inc., CA [IM] Rep. California Automatic Fire Alarm Association Inc. Joe Scibetta, BuildingReports, GA [M] George E. Seymour, Montgomery, TX [IM] Rep. National Association of Fire Equipment Distributors Derek Shackley, Pacific Auxiliary Fire Alarm, CA [M] Rep. Automatic Fire Alarm Association, Inc. Michael J. Slattery, AFA Protective Systems, Inc., MA [IM] Timothy M. Soverino, Nantucket, MA [U] Rep. International Municipal Signal Association Charles K. Stormer, U.S. General Services Administration, IL [U] Rep. U.S. General Services Administration Frank L. Van Overmeiren, Fire Protection &: Code Consultants LLC,IN [SE]

Bill Isemann, Guardian Fire Protection Services LLC, MD [IM] (Alt. to George E. Seymour) Matthew Jackson, AFA Protective Systems Inc., NJ [IM] (Alt. to Michael J. Slattery) David E. Kipley, JENSEN HUGHES, IL [SE] (Alt. to j.Jeffrey Moore) Peter Leszczak, U.S. Department of Veterans Affairs, CT [U] (Alt. to Peter A. Larrimer) Thomas Presnak, UL LLC, IL [RT] (Alt. to Louis Chavez) Michael D. Sides, Global Asset Protection Services, LLC, FL [1]] (Alt. to Charles E. Brockett) Terry L. Victor,Johnson Controls/Tyco/SimplexGrinnell, MD (Alt. to E. J. Kleintop)

Richard I. Roux, NFPA Staff Liaisor

2019 Edition

NATIONALEIRE ALARM AND SIGNALING COD!

2019 Edition

NationalFireAlarmand SignalingCode

NationalFireAlarmandSignalingCode

2019 Edition

Chapter 1Administration

Chapter 1 Administration

2019 Edition

NATIONAL EIRE ALARMLAND SIGNALING CODE

1.2*Purpose

1.2.2 This Code defines the features associated with these systems and also provides information necessary to modify on upgrade an existing system to meet the requirements of a particular system classification

1.3 Application.

specific chapter. Chapter 29 is designed to stand alone unless it specifically references an earlier chapter

pecific chapter. Chapter 29 is designed to stand alone un pecifically references an earlier chapter

1.4 Retroactivity

1.5Equivalency

er 2Referenced Publicatior

REEERENCED PUBLICATIONS

2.3Other Publications.

Shaded text = Revisions.△ = Text deletions and figure/table revisions.• = Section deletions.N = New material.

2019 Edition

3.3 General Definitions

DEEINTIONS

3.3.12 Alarm Box

2019 Edition

2019 Editior

NATIONAL EIRE ALARMLAND SIGNALING CODE

3.3.40 Ceiling Surfaces

DEEINTIONS

2019 Edition

2019 Editior

NATIONAL EIRE ALARMLAND SIGNALING CODE

DEEINTIONS

2019 Edition

TB/T 1669-2018 机车车辆车钩缓冲装置计量器具13型车钩量具2019 Editior

NATIONAL EIRE ALARMLAND SIGNALING CODE

DEEINTIONS

2019 Edition

3.3.119Flame Detector.See 3.3.70.Detectoi

2019 Editior

YY/T 1718-2020 人类体外辅助生殖技术用医疗器械 胚胎移植导管NATIONAL EIRE ALARMLAND SIGNALING CODE

©版权声明