标准规范下载简介:
内容预览由机器从pdf转换为word,准确率92%以上,供参考
e+h Transmitter_FMU90 超声波液位计 英文版The sensors FDU80/80F/81/81F/82/83/84/85/86/96 are not available anymore
Endress+Hauser
Prosonic S FMU90
Prosonic S FMU90
FZ/T 93077-2011 环锭细纱机用导纱钩The HART signal is assigned to the first analog output. The second analog output does not carry a signal
Endress+Hauser
Prosonic S FMU90
PROFIBUS DP interface
Power supply
Power supply
Endress+Hauser
Prosonic S FMU90
Electrical connection
Endress+Hauser
Prosonic S FMU90
Endress+Hauser
Prosonic S FMU90
Prosonic S FMU90
1. Open the catch of the cover (e.g.by a screwdriver) 2. Pull the cover out by approx. 20 mm (0.79 in) . 3.The cover can now be opened. The cables can be inserted into the housing from above or from below. The pictures show the smallest housing version but are valid for the larger versions as well. If the instruments are mounted next to each other and if the sensor cables run in parallel, the synchronization terminals (39 and 40)mustbe interconnected (see sections→ 15'Terminal assiqnment'and→自19"Synchronization line")
Endress+Hauser
Endress+Hauser
ProsonicSFMU90
Terminal assignment
Endress+Hauser
Theterminalconfigurationdependsontheinstrum entversionordered.Thereisabasicterminalarea respective option has been selected in the product structure
Prosonic S FMU90
Endress+Hauser
Prosonic S FMU90
In this case, terminals 9/10/11 are not present on terminal area A
Endress+Hauser
Additional elements on the terminal areas
Prosonic S FMU90
Prosonic S FMU90
For details refer to Technical Information TI00396F/
Endress+Hauser
Endress+Hauser
Prosonic S FMU90
display and operating module
Endress+Hauser
Fortheversion of the connecting cable (3 m (9.8 ft)) is supplied. The cable must be connected to the display plug of the
Minimum diameter for cable bushing: 20 mm (0.79 in)
Prosonic S FMU90
Prosonic S FMU90
Connection of a temperature sensor
Endress+Hauser
Endress+Hauser
Prosonic S FMU90
RD Cable color= Red
Endress+Hauser
Moreinformationcanbefoundinthefollowingdocul 1TI01029T
Prosonic S FMU90
Prosonic S FMU90
Ex area, with connection via terminal box RDCable color = Red
More information can be found in the following documents: TI01029T
Endress+Hauser
Endress+Hauser
Prosonic S FMU90
Endress+Hauser
Prosonic S FMU90
Prosonic S FMU90
Performancecharacteristics
Environment
Endress+Hauser
Prosonic S FMU90
Mechanicalconstruction
Endress+Hauser
Prosonic S FMU90
Prosonic S FMU90
The dimensions of the field housing aluminium are the same for all instrument versions To open the housing, a minimum mounting distance of 55 mm (2.17 in) is required on the left
Using the following table, determine how many optional terminal areas this instrument version contains.
Endress+Hauser
Prosonic S FMU90
Sum = 4 (4 optional terminal areas
Endress+Hauser
10 20 30 40 5060 70 80 90 100110120
Prosonic S FMU90
Prosonic S FMU90
Prosonic S FMU90
Endress+Hauser
Field housing aluminium with DIN rai
Prosonic S FMU90
Prosonic S FMU90
Operability
Display (Examples)
Endress+Hauser
Prosonic S FMU90
Basic setup
Endress+Hauser
Prosonic S FMU90
Prosonic S FMU90
CertificatesandApprovals
External standards and quidelines
DL/T 5590-2021 电网工程施工招标文件与合同编制导则Endress+Hauser
Prosonic S FMU90
Orderinginformation
Accessories
Endress+Hauser
Prosonic S FMU90
DB34T 2290-2015 水利工程质量检测规程Endress+Hauser
Prosonic S FMU90