施组设计下载简介:
内容预览随机截取了部分,仅供参考,下载文档齐全完整
某住宅楼6#、7#楼及地下车库施工组织设计基本情况及会签···········································1
工程概况·················································5
施工部署················································11
施工平面布置图··········································13
宿淮高速公路箱梁施工组织设计施工准备工作············································14
主要项目施工方法········································23
质量保证措施············································53
安全技术措施············································57
技术节约措施············································64
冬季施工措施············································66
雨季施工措施············································68
主要材料用量············································70
技术经济指标············································71
附录····················································72
施工组织设计补充········································74
附图一:深基坑挡土支护结构平面示意图
附图二:深基坑挡土支护结构剖面示意图
附图三:降排水系统平面图
附图四:吊模施工示意图
附图五:地下室墙模板支撑图
附图六:外脚手架搭设形式
工程名称:×××6#、7#楼及地下车库17至39轴(B段)
工程地点:××××××
建设单位:××××××
设计单位:××××××
总包单位:××××××
监理公司:××××××
监督单位:××××××
开工时间:××年11月20日
公司部门审核会签(一)
公司部门审核会签(二)
SBS改性沥青卷材防水
现浇混凝土墙,外墙300mm内墙200mm
厚度250mm100mm
SBS改性沥青卷材防水
SBS改性沥青卷材防水
现浇混凝土墙,外墙300mm内墙200mm
厚度250mm100mm
SBS改性沥青卷材防水
SBS改性沥青卷材防水
现浇混凝土墙,外墙300mm内墙200mm
厚度250mm100mm
SBS改性沥青卷材防水
6#楼5.3m、7#楼5.2m
6#楼1.4m、7#楼0.5m
大体积混凝土类型供货单位
预应力混凝土管桩、混凝土方桩
深基坑挡土支护结构平面示意图(详见附图1)
深基坑挡土支护结构立面示意图(详见附图2)
注:用于基坑东侧25m处
建筑红线控制桩坐落位置及示意图
给定水准点高程及位置示意图
设计室外绝对标高(m)
山东某土地整理项目施工组织设计6#楼3.857#3.80
设计首层地面绝对标高(m)
6#楼4.357#4.30
该建筑位于×××地内。建筑南侧为拟建建筑,即×××7#楼;建筑北侧为施工临时道路,建筑西侧距××河仅为30m米,建筑东侧为施工临时道路和拟建建筑,施工现场较平坦开阔。
红线内地下埋藏物及管线状况
本场地原为荒地,局部有坑塘,后经人工填垫至现地坪,现地坪基本平坦。
白色华村特大桥施工组织设计方案地下除布满杂填土和部分地区有淤泥外无任何埋藏物及管线。
场地表面局部有击水,地表层-1.4m以下见水,采取拟建建筑物周围明沟及集水井排水,并在基坑平面内纵横间隔20m设管井,井深8米,进行降水。
6、7#楼部分按楼层分段