施工组织设计封面及目录题目:施工组织毕业设计
院系:建筑与土木工程学院
院系建筑与土木工程学院专业建筑工程管理
年级08级学号0804020422姓名韩鹏杰
TCECS 595-2019 建筑用加湿技术应用规程答辩委员会主任(签章)
班级建工管0804学生姓名韩鹏杰学号0804020422
发题日期:年月日完成日期:年月日
应完成的硬件或软件实验
应交出的设计文件及实物(包括设计论文、程序清单或磁盘、实验装置或产品等)
指导教师提供的设计资料
要求学生搜集的技术资料(指出搜集资料的技术领域)
本设计是本人独立完成;
本设计没有任何抄袭行为;
若有不实,一经查出,请答辩委员会取消本人答辩资格。
承诺人:叶飚
2008年 01月 14日
第一章:工程概况···············································(1)
1.1现状概况················································(1)
1.2布局规划················································(1)
1.3项目部组织机构及职责·····································(3)
第二章:施工部署···············································(9)
第三章:主要施工保证措施······································(10)
3.1内业准备················································(10)
3.2轴线引测················································(10)
3.3新上岗人员进行培训到位··································(10)
第四章:工程测量与施工放线···································(12)
4.1测量放线的基本要求·····································(12)
4.2施工测量前的准备工作···································(13)
第五章:施工方法及技术措施···································(14)
5.1三合土场地·············································(14)
5.1.1施工方法·············································(14)
5.1.2技术措施·············································(14)
5.2砼场地·················································(14)
5.3花岗岩广场··············································(15)
5.4铺装场地···············································(16)
5.5人工挖基坑槽···········································(16)
5.6土方回填工程···········································(16)
5.7砌砖工程···············································(17)
5.8砌石工程···············································(17)
5.9钢筋砼工程·············································(17)
5.10外墙装饰面施工········································(19)
5.11给水管道安装··········································(19)
5.12排水管道安装··········································(20)
5.13草坪灯、投光灯、水下灯安装······························(20)
5.14地埋灯及庭院灯安装····································(21)
5.15绿化工程··············································(21)
第六章:质量保证措施···········································(23)
6.1各项质量管理制度·······································(23)
6.2质量通病防治措施·············································(26)
6.3季节性施工技术措施·····································(26)
6.3.1雨季施工技术措施·····································(26)
6.3.2高温季节施工技术措施·································(27)
6.4确保工期组织措施·······································(27)
6.5安全生产技术措施及消防保证措施·························(28)
6.6文明生产、文明施工措施··································(33)
6.7环保措施···············································(34)
6.7.1环境管理控制点·······································(34)
6.7.2环保保护措施·········································(37)
6.8HSE管理体系············································(38)
6.9降低成本提高效益措施措施·······························(39)
JG/T477-2015 混凝土塑性阶段水分蒸发抑制剂6.9.1成本控制要素·········································(39)
6.9.2降低成本措施·········································(40)
6.10现场采用微机等现代化管理手段··························(40)
6.11地下管线及其他地下地上设施的胛加固措施················(41)
结束语·························································(42)
致谢·························································(43)
参考文献·························································(44)
本工程为慈溪市太阳纺织器材有限公司二期工程,是多层民用建筑,建筑面积为2677.9m2,是三层框架结构,房屋高度为15.40m。本次施工组织设计,以图纸为依据,结合实际的施工,编制出施工计划,绘制出施工进度横道图。
DZ/T 0212.1-2020 矿产地质勘查规范 盐类 第1部分:总则.pdf关键词:多层民用建筑、框架结构、施工组织设计、施工进度横道图